STEAM BATHROOM MODEL : WS-608A Your best choice! No advanced advice will be submit before we change our design and size. The pictures may be a little different from the real products. Our company keep the final explanation right.
Dear Guest, Thank you very much for purchasing our sanitary ware. To enable you to use this product safely and effectively, please read this installation and operation manual carefully before use. Self-clean system Step 2 Step 1 CAUTIONS 1. Please ensure that the product installed reliable electric leakage protection device, the power plug contains earth line, and make sure it is reliable earth line. Check the protect system of leakage protection each time before use. 2.
Packing list 3 Packing 1 three pieces of ABS board, two pieces of sliding glass door,two pieces of fixed glass door. Packing 2 one tray,one roof, two pieces of up and down bended aluminum column, two pieces of deluxe shower holding bar, one set of foot massage, one piece of steam pipe with plastic pad.
ATTENTION 1、back-acupuncture switch 2、pump switch 3、air conditioning 4、waterfall 9 5、water intake 6、big nozzle(6PCS) 7、drainage device 8、drainage switch 9、pillow 1.In order to be tripped and fell down, pay more attention when get into the steam room. Please don't shut the finger in the door in order to be hurt. 2.In order to avoid damaging the surface of products please do not use hardness and sharpness tool to curve the products. 3.In order to course fire, no smoking inside the bathroom. 4.
Attention: The machine must be fixed in the circuit which protected by creepage protectionand should be well-connected with the ground. Nontechnical people can not be fixed or removed at random. INSTALLATION PROCESS STEP1 Drain 6、Technical parameter Model Voltage Current KL-824 110V 25A Fan 3.5W Top light 20W AC12V Sidelight 5W AC12V DC12V Power 2650W protecting electrifying I Waterproof Grade Ip4 Water inlet valve Water drain valve 6W DC12V 7W DC12V 1.
STEP3 M6×35 3. Install the shower body onto the tray Put the shower body onto the tray,fix it with M6*35 screws. St4x20 STEP4 St4x25 St4x16 STEP5 5. Assembly of sliding door put the sliding door into the up and down aluminum track to keep it balance. 05 WS-608A 4. Assembly of fixed glass door Put the left and right side fixed door into the up and down aluminum track to keep it balance,fixed them with ST4*20 screws,ST4*25 screws,ST4*16 screws.
STEP6 1 4 2 5 3 6 7 8 STEP7 C 09 C 1 Time adjustment pitch+ 5 Temperature adjustment pitch- 2 Temperature adjustment pitch+ 6 Fan Pitch 3 CeilingLamp/Back Lamp pitch Steam Pitch 4 Time adjustment pitch- 7 8 WS-608A Main Cock Pitch 6. Install the glass door onto the tray Put the plastic pad onto the aluminum post of glass door,if the length of the plastic is not suitable for the aluminum post,you can cut it in suitable size,then put it on the tray,screw with bolts. 7.
DRAWING OF ELECTRICITY CONNECTION DRAWING OF WATER CONNECTION clean system As the“ ” “ ”from the picture,please make the connection according to the serial number v1,v2,etc.