STEAM BATHROOM MODEL : WS-902A 、 WS-902B Your best choice! No advanced advice will be submit before we change our design and size. The pictures may be a little different from the real products. Our company keep the final explanation right.
Self-clean system TECHNIQUE PARAMETER Voltage Frequency Water Volatge Power of steam generator Step 2 Step 1 AC110V 0.1~0.2Mpa 60H Z 2.65KW CONSTRUCTION SKETCH 32 33 Handrail 35 36 Pour into cleaning liquid from here 34 Step 3 Step 4 1 2 5 6 8 7 9 3 Glass door 36 10 4 37 Cleaning method: 1.Clean the steam engine regularly at least once by every 2weeks or after using 20 times. 2.Inject citric acid as main cleaning liquid,add 1.5L each time.
CONSTRUCTION SKETCH Packing list Packing 1 two pieces of back board,two pieces of fixed glass door,two pieces of sliding glass door,water resist strip four pieces,two pieces of magnetic strip for aluminum column,two pieces of aluminum column with U shaped plastic seal.
ATTENTION INSTALLATION SKETCH 2150(84.6″) 1 5 0 ″) (5.9 Cold water pipe Hot water pipe 370(14.6″) ″ ) 40 ″) .7 07 0( 15 ),1 .7 ″) ″) ″) 0 (1 Other screws 0( 42 40 15 07 ″ 5 .7 40 ),1 .2 0( 5 .7 ″ M4x15 M4x25 .1 36 40 0 (1 .2 0( 42 .1 36 0( 0( 1800 (70.9″) 1250 (49.2″) 92 ″ 92 The socket of power and the socket of telephone ) Install the screw M6x25 1.In order to be tripped and fell down, pay more attention when get into the steam room.
INSTALLATION PROCESS Attention: The machine must be fixed in the circuit which protected by creepage protectionand should be well-connected with the ground. Nontechnical people can not be fixed or removed at random. 1. Assembly of tray If the ground is not smooth,please adjust the nail under the tray to keep the balance of the tray and ground. STEP 1 6、Technical parameter Model Voltage Current KL-824 110V Top light 20W Sidelight 5W 25A Fan 3.
4. Assembly of fixed glass door Put the left and right side fixed door into the up and down aluminum track to keep it balance,fixed them with 4*25 screws. (1) The electrical pitch Press pitch can open the machine, the temperature is the room temperature.The time will show 30m. At the same time, it will open the ceiling lamp.Press again will close all the functions. (After the closure of the machine, the water case will drainfor 2 minutes) (2) The application of the back lamp Press ,the sidelight is on.
6. Install the glass door onto the tray Put the plastic pad onto the aluminum post of glass door,if the length of the plastic is not suitable for the aluminum post,you can cut it in suitable size,then put it on the tray,screw with bolts. 1 4 2 5 3 6 7 8 C C 1 Time adjustment pitch+ 5 Temperature adjustment pitch- 2 Temperature adjustment pitch+ 6 Fan Pitch 3 CeilingLamp/Back Lamp pitch Steam Pitch 4 Time adjustment pitch- 7 8 09 Main Cock Pitch STEP 6 M6x25 7.
DRAWING OF WATER CONNECTION Instructions: 1.You should install the water DRAWING OF ELECTRICITY CONNECTION clean system heater yourself. 2.As the“ ”“ ”from the picture,please make the connection according to the serial number v1,v2,etc .