Operating Guide

EN - 11
Install Drive Pulley
See Figure 9.
1. Align holes of bagger sheave adapter
(item 7) with holes in spindle pulley and
position adapter on sheave. The cupped
surface in the adapter faces down.
2. Retain the adapter with two 5/16" x 3/4"
tapping screws (item 14).
3. Using a sturdy block of wood or other
suitable device, block blades from turning
and tighten tapping screws. Torque to
28.6 N•m (21 lb-ft).
See Figure 10.
4. Position V-pulley (item 8) on adapter and
retain with two 1/4” locking washers
(item 9) and two 1/4” x 1/2” hex bolts
(item 10).
5. Torque hex bolts to 9.5 N•m (7 lb-ft).
Install Belt Cover Support
Model 815049
1. Install 5/16" x 1 1/2" round head square
neck bolt (item 19) through belt cover
bracket (item 3) with 5/16” hex jam nut
(item 12) and 7/16” x 1" x 3/32" flat steel
washer (item 43). Bolt is installed in tab
without trimmed corner. See Figure 11.
2. Locate 9/32” square hole near discharge
opening and remove 5/16” self-tapping
screw (if present). Attach belt cover
bracket at angle shown using one
1/4" x 3/4” round head square neck bolt
(item 1) and one 1/4” top lock flange hex
nut (item 4). See Figure 12.
CAUTION: Rotating one blade
will cause all blades to rotate.
Mower blades are sharp. Use
heavy gloves or cover blades
with tape.
14
7
Figure 9
Figure 10
8
9
10
Figure 11
3
12
19
43
Figure 12
4
1
9/32"
Square Hole