Installation Guide

11
Installation Instructions
Ductwork and wiring locations
Determine the exact location of the vent hood.
The height installation is determined by the image shown above. Mark the location.
8’ Ceiling: 30” (minimum)
10’ Ceiling: 35” (minimum)
h
h
Minimum
Height
25-3/16”
36”
The vent hood must be installed above the cooking surface at 30" (minimum) if installed under an 8’ ceiling, or at
35” (minimum) if installed under a 10’ ceiling.
The hood may be installed vented to the outdoors, or it can be installed for recirculating operation (recirculating
accessories not supplied with the hood).
This hood must not be installed over any professional cooktop / range.
Removing the packaging
CAUTION: Remove the carton carefully. Wear gloves to protect against sharp edges.
WARNING: Remove the protective film covering the product before putting into operation.
Installing preparation
Install the 8” round transition as shows the image below. The installation screws and the 8” round transition }
are included on the hood package.
8”