Getting Started Instructions

OEM-AP-C250 Getting Started Guide
Package Contents
The C-250 package must contain the following components.
Ceiling Mounting the C-250
1. Ax bracket to T - Grid.
2. Rotate bracket to snap
on to T- Grid.
3. Place the rst mounting post on the
rear-side of the device on to the lower
notch of the bracket.
15/16” (24mm)
Mounting Bracket
C-250