E Combi ONE Installation Manual

20 /
INSTALLATION
Fitting the 5” Flue
(Ø 80 / 125 Horizontal/vertical)
Once the boiler has been positioned on the wall, it is necessary
to insert the Ø80/125 adaptor (Fig. 5) for both horizontal and
vertical ue runs into the boiler ue socket (not supplied with
ue kit - Part No 3318095).
Push the adaptor onto the boilers ue connection, grease the
seals then add extensions or elbows as required, secure the
adaptor, using the clamp and screws provided.
To t extensions or elbows it is rst necessary to ensure that
the lip seal is tted correctly into the inner ue, once veried,
it is simply necessary to push them together, no clamps are
necessary to secure the ue components.
Before proceeding to t the ue, ensure that the maximum ue
length has not been exceeded (See the tables) and that all
elbows and bends have been taken into consideration, for each
additional 90° elbow 1 metre must be subtracted from the total
ue length, and for each 45° 0.5 metres must be subtracted from
the total ue length (the height of the vertical adaptor and a 45°
bend can be seen in Fig.6 and a 90° bend in Fig. 7).
Note: DO NOT cut the vertical ue kit.
180 mm
Total length
of Vertical Kit
1240 mm
5" Adaptor
Part no: 3318095
* This length will vary
according to the type
of ashing installed
Useable length
of Vertical ue
575 mm*
Fig. 5
Clamp
Seal
Screws
Fig. 4
Fig. 6
Fig. 7