E Combi ONE Installation Manual

/ 21
INSTALLATION
Fitting the Coaxial Flue
(Ø 60 / 100 Vertical)
Note: See table for maximum and minimum ue runs.
Contents:
1x Conical Adaptor (60/100mm)
1x Vertical Flue Kit (80/125mm)
The vertical ue kit is supplied with a specially designed
weather proof terminal tted, it can be used either with a at
roof or a pitched roof.
The Vertical ue kits useable lengths with the pitched roof
ashings are indicated in Fig. 7.
Before proceeding to t the ue, ensure that the maximum ue
length has not been exceeded (See the tables) and that all
elbows and bends have been taken into consideration, for each
additional 90° elbow 1 metre must be subtracted from the total
ue length, and for each 45° 0.5 metres must be subtracted from
the total ue length (the height of the vertical adaptor and a 45°
bend can be seen in Fig. 8).
Mark the position of the ue hole in the ceiling and/or roof (see
Fig. 7 for distance from wall to the centre of the ue).
Cut a 130mm diameter hole through the ceiling and/or roof and
t the ashing plate to the roof.
DO NOT cut the vertical ue kit.
To connect the vertical ue kit directly to the boiler, place the
vertical starter kit (Part No. 3318079) (see Fig. 7) onto the exhaust
manifold and secure with the clamp, t the vertical adaptor onto
the vertical starter kit (note: there is no need to use a clamp to
secure this as it is a push t connection), the vertical ue kit must
then be inserted through the roof ashing, this will ensure that
the correct clearance above the roof is provided as the terminal
is a xed height.
Should extensions be required, they are available in 1 metre
(Part No. 3318077), 500mm (Part No. 3318078) and they must be
connected directly to the vertical starter kit before connecting
the adaptor to allow the vertical ue kit to be tted. In the event
that extension pieces need to be shortened, they must only be
cut at the male end and it must be ensured that the inner and
outer ue remain ush.
When utilising the vertical ue system, action must be taken
to ensure that the ue is supported adequately to prevent the
weight being transferred to the appliance ue connection by
using 1 ue bracket per extension.
When the ue passes through a ceiling or wooden oor, there
must be an air gap of 25mm between any part of the ue
system and any combustible material. The use of a ceiling
plate will facilitate this. Also when the ue passes from one
room to another a re stop must be tted to prevent the passage
of smoke or re, irrespective of the structural material through
which the ue passes.
180 mm
Vert Adaptor
(supplied with ue kit)
Vertical Starter
Part No: 3318079
* This length will vary
according to the type
of ashing installed
Total length
of Vertical Kit
1355 mm
Useable length
of Vertical ue
690 mm*
Fig. 7