Technical information

19
installation
Instructions for opening the casing and perform-
ing an internal inspection
Before performing any work on the boiler, ๎€žrst
disconnect it from the electrical power supply using
the external bipolar switch, removing the fuse and
shutting o๎€ the gas valve.
To access the inside of the boiler, the following is
necessary:
1. Loosen the two screws on the front casing (a), pull
it forwards and unhook it from the upper pins (b)
3. Remove the control panel (c)
4. Unhook the two clips on the combustion chamber
panel and lift o๎€ (d).
(b)
(d)
(a)
(c)