Operation Manual

FP1200 SERIES ANALOGUE ADDRESSABLE FIRE PANEL: User Instruction Manual Revision 4.2: August 1998
7. ROUTINE MAINTENANCE
In order to ensure the reliable operation of the FP2000 Series systems, they should be regularly
tested and serviced.
The following maintenance routine should be adopted:
7.1 DAILY
On a daily basis the user should check the following:
7.1.1 that the panel indicates normal operation, or if not, that any fault indicated is
recorded in the logbook and reported to the maintenance personnel;
7.1.2 any fault warning recorded the previous day has received attention;
7.1.3 that the printer ribbon and paper supply are adequate (if applicable), or else replace
as shown in Appendix A.
7.2 QUARTERLY
On a quarterly basis the following actions should take place:
7.2.1 logbook entries should be checked and the necessary action taken;
7.2.2 the state of the batteries and corresponding connections should be checked;
7.2.3 the fire panel should be visually inspected for signs of moisture ingress and other
deterioration;
7.2.4 the alarm, fault and ancillary functions of the fire panel should be tested.