Installation Guide

1) Find the centerline of where the unit will be
installed. This will usually be the center of the
ledge of the bath tub or the curb of the shower
pan. Place a centerline mark at each end of the
tub ledge or curb where it meets the wall. This
mark will also represent the center of the
ZTE1203 wall jamb (item #1 in exploded view).
Place the wall jamb against the wall and on top
of the ledge or curb aligning centerline marks
(A). If your shower is fiberglass you might have
to file the backside corner of the ZTE1203 to a
radius so the jamb sits as flush as possible on
the ledge or curb. Use a level to position the
jamb plumb, then mark the installation holes
with a pen or pencil
(B). Repeat this procedure
for the other jamb. Now drill the 6 holes with a
3/16” masonry bit (9/64” for fiberglass, & with-
out anchors). Then insert the 6)-ZV935 screw
anchors (#9) in the holes. Fasten the ZTE1203
wall jambs in place using the #8X1-1/4 Phillips
Pan Head screws provided (#3)
(C). Important
Note: The ZV926 Bottom Bumper (#4A) needs
to be installed with the bottom screw on the
jamb, on the showerhead side of the unit, with
the angled side of the bumper going to the in-
side of the shower
(D). Refer to the exploded
view. Attach
Model ETE-1/4/ESE-1/4
Installation Instructions
for
Note: These instructions will refer to the item #’s in the Exploded View drawing. For example, #1, #2, #3 etc…
Please read through all of the instructions to get an over-view before you install the door.