Installation Guide

totheexplodedviewdrawing.
2)
Measurethedistancebetweentheinsideof
the wall jambs (just above the tub ledge or
curb). Measure tightand deduct 1/16” to 1/8”
togetthecutsizeoftheZTE2222Curb(#8)
(E).
Cut to size. Apply silicone where wall jambs
meet tub or curb
(F). Then run a bead under‐
neath the ZTE2222 Curb
(F2). Slide the curb
down between the wall jambs and onto the
tub/shower. Make sure the curb is solid and
doesn’trockbackandforth
(G).Ifitisnotsolid,
secureitwithtwoofthe#6X3/8PanHead
Screws (#20) by drilling with a 1/8” drill bit
throughtheoutsidelegofthewalljambatthe
bottom,intothefaceofthecurbandinserting
thescrews
(G2).
3)
Measure the distance from wall to wall
across the top of the jambs. Cut the ZTE6221
Header(#13)tothatdimensionminus‐1/16.
Slidetheheaderdownoverthetopofthewall
jambs.Theheaderdoesnotneedtobesecured
withscrews
(H).
4)
Install the panels. The inside panel will be
set first. (The inside panel will have the knob).
Thiswillbedoneasyoustandontheoutsideof
theshower.Griponeofthepanelsoneachside
sothattherollersarefacingawayfromyou.Lift
the panel so that the bottom edge clears the
topoftheZTE2222Curbasyouloweritintothe
shower.Continueloweringthepaneldown