Arizona Corporate Office 2801 W.
side of the bumper Installation Instructions for Model FTE & FSE Note: These instructions will refer to the item #’s in the Exploded View drawing. For example, #1, #2, #3 etc… Please read through all of the instructions to get an over‐view before you install the door. 1) Find the centerline of where the unit will be installed. This will usually be the center of the ledge of the bath tub or the curb of the shower pan. Place a centerline mark at each end of the tub ledge or curb where it meets the wall.
to the exploded view drawing. 2) Measure the distance between the inside of the wall jambs (just above the tub ledge or curb). Measure tight and deduct 1/16” to 1/8” to get the cut size of the ZTE2222 Curb (#8)(E). Cut to size. Apply silicone where wall jambs meet tub or curb (F). Then run a bead under‐ neath the ZTE2222 Curb (F2). Slide the curb down between the wall jambs and onto the tub/shower. Make sure the curb is solid and doesn’t rock back and forth (G).
until the top rollers can be guided up into the inside roller track of the header. Lift up panel then slowly lower the rollers into the inside roller track and let the panel hang in its vertical position. The outside panel will be installed the same way. Make sure the rollers are facing to‐ ward you. A helper would be valuable at this point to hold the inside panel on an angle to‐ ward the inside so that the outside panel can be lowered and positioned to be installed into the outside roller track.
7) Attach one ZTE7206 (#14) (L) Towel Bar Bracket using one of the two #6/32x3/8” PH Truss Head Screw (#19). Place the ZTE7205 Towel Bar (#15) into the other ZTE7206 Towel Bar Bracket then slip the other end of the towel bar into the previously mounted bracket. Hold into place while you run the other screw through the frame and into the bracket. 8) Attach the ZTE7204 Framed Knob (#7) (M) by inserting the mounting screw (#19) through frame and into the knob and tighten.