Installation Guide

INSTALLATION OF WELDED FRAMES
P
R
I
O
R
TO INSTALLATION
The installer shall perform the following prior to
installation:
The area of floor on which the frame is to be
installed and the path of the door swing shall be
checked for flatness and levelness. Permissible tol-
erance is +/- 1/16 in. (1.5mm). If the floor exceeds
this, it is the general contractor’s responsibility to
correct the area that is out of tolerance before the
frame is installed.
Frame shall be checked for correct size, swing, fire
rating and opening number.
Remove temporary steel sprea
ders. Spreaders can
typically
be removed with cold chisel and hammer.
With frame standing on concrete,
position cold
chisel at w
eld joint of spreader and jamb and str
ik
e
chisel with hammer
.
TYPICAL INSTALLATION PROCEDURES
Position frame in the correct location. Brace the
frame as shown, Figure 1. Do not brace in the direc-
tion of intended wall.
FIGURE 1
FRAME BRACING
With frame in position, install the temporary wood
spreaders.
The wood spreader, Figure 2, must be
square and no less than 1 in.
(25 mm) thick. Correct
length is the door opening width between the jambs
at the header. Cut clearance notches for frame
stops.
Spreader must be nearly as wide as frame
depth for proper installation. Install a spreader at
the bottom of the frame and a second wood spread-
er at the mid or strike point to maintain a proper
door opening and to prevent bowing of the jambs,
Figure 3. Clamp or wire spreaders to frame to hold
spreaders in place until the frames are set perma-
nently in the wall.
2"x4" BRACE
SUPPORT BRACE
AT FLOOR
VS-SERIES. INSTALLATION INSTRUCTION
FIGURE 2
WOOD SPREADER
FIGURE 3
SPREADER LOCATION
DOOR OPENING AT HEADER
FRAME
DEPTH
SPREADER
SPREADERS
NOVEMBER 1, 2015