Installation Guide

1
Armstrong Crescendo™ Tile Installation System
With or Without Grout
Installation Materials
Tools:
Utility knife
Pencil
Medium grit sandpaper
Sanding block
Smooth edge trowel
Tape measure
Short nap paint roller
Chalk and chalk line
Rolling pin
Carpenter’s square
S-184 Patch and Skim Coat for patching or filling textured surfaces
S-194 Patch, Underlayment & Embossing Leveler
S-195 Underlayment Additive
S-185 Latex Primer
Additional materials for a grouted installation:
1/16” to 1/4” Tile Spacers
Premixed Sanded Acrylic Grout
Grout Float
Square-edged Rigid Sponge
Ammonia-based Cleaner
Non-scratch White (3M) Scrub Pad
Installation Requirements
Store tile in the room in which you plan to install for 48 hours. Keep room at minimum of 65° F (18° C) during
that time and during installation. After installation, temperature should not fall below 65° F (18° C) for the first 48
hours, and not below 55° F (13° C) after that.
If room is heated by radiant coils in the subfloor, the temperature of the floor surface should not exceed 85° F
(29° C).
The subfloor should be level, clean, and free of wax, grease, oil or dust.
If necessary, patch or fill any cracks in the subfloor with Armstrong patch or latex underlayment.
If installing over existing vinyl, use liquid underlayment or embossing leveler ro smooth any texture or embossing
on the old floor.
Install over smooth, well-bonded resilient floors, ceramic, terrazzo, marble or over dry concrete and wood floors
with a plywood overlay.
Estimating
Find your room size on chart. Number in square is how many cartons you need. Charts include at least five extra tiles
per 100. These extra tiles are needed to allow for waste and odd room size.
6’
8’
10’
12’
14’
16’
18’
20’
6’
8’
10’
12’
14’
16’
18’
20’
6’
2
2
3
3
4
5
5
6’
2
2
3
3
3
4
4
8’
2
3
4
4
5
6
7
8’
2
3
3
4
4
5
5
10’
3
4
5
5
6
8
9
10’
3
4
4
5
5
6
7
12’
3
4
5
6
7
9
10
12’
3
4
5
6
6
7
8