Owner's Manual & Assembly Instructions WPOI Model No. 697.68222 ARROW CAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST BE TAKEN WHEN HANDLING THEVARIOUS PIECES 715500109 TO AVOI D A MISHAP. FOR SAFETY SAKE, PLEASE READ SAFETY INFORMATION PROVIDED IN THIS MANUAL BEFORE BEGiNNiNG CONSTRUCTION.WEAR GLOVES BUiLDiNG DiMENSiONS * Size rounded offtothe nearest foot Exterior •Approx. Size 10'x12' Foundation Size 121"x1431/4" Storage Area Sq. Ft. Cu. Ft.
BEFORE YOU BEGIN.... A2 Owner's Manual Before beginning construction, check local building codes regarding footings, location and other requirements. Study and understand this owner's manual. easier and more Important information and helpful tips will make your construction enjoyable. Assembly Instructions: Instructions are supplied in this manual and contain all appropriate information for your building model.
PLAN AHEAD.... A3 Watch the Weather: Be sure the day you select to install your building is dry and calm. Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Teamwork: Whenever possible, two or more people should work together to assemble your building. One person can position parts or panels while the other is able to handle the fasteners and the tools. Tools and Materials: These are some basic tools and materials construction of your building.
SAFETY FIRST.... A4 Safety precautions are important to follow ,,Care must be taken when handling various pieces of your building since some contain sharp edges. Please wear work gloves, eye protection and long sleeves when assembling or performing any maintenance on your building. throughout the construction of your building. ,,Practice caution with the tools being used in the assembly of this building. Be familiar with the operation of all power tools.
CARE & MAINTENANCE.... A5 Web Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch- up scratches as soon as you notice them on your unit. Immediately a wire brush; wash it and apply touch-up paint per manufacturer's Roof: clean the area with recommendation. Keep roof clear of leaves and snow with long handled, soft-bristled broom. Heavy amounts of snow on roof can damage building making it unsafe to enter.
ACCESSORIES.... A6 WEB ROOF (heavy STRENGTHENING snow load) KITS FLOOR FRAME KITS Extra roof beams and gable braces designed for added protection against heavy snow accumulation. Increases the strength of your roof by 50%. ANCHOR Model KITS No. AK4 Anchor Kit contains heavy-duty steel augers, 60' (18m) of steel cable and 4 cable pouring, just insert cable under roof, over roof beams, into augers and twist augers ground. For buildings clamps.
THIS PAGE WAS LEFT BLANK INTENTIONALLY 7
THIS PAGE WAS LEFT BLANK INTENTIONALLY 8
Foundation AQ09 OPTION 1: ARROW FLOOR FRAME KIT: No.FB1014-A or 68387-A) Arrow has the best base for your building in this simple kit. It keeps stored items above the ground. This kit should be used with one of the following: A. To support a plywood deck B. To be filled with sand. We recommend the combined use of 1. an ARROW FLOOR FRAME KIT and 2. an ARROW ANCHORING KIT as an effective method of securing the building to the ground. Allow I - 2 hours for construction.
Anchoring AI0 It is important that the entire floor frame be anchored after the building is erected. Below are recommended ways of anchoring. Arrow Anchoring Kit: (Model No. AK4 or 60298) Recommended for use with any suggested base. Contains: 4 Anchors with Cable, Clamps and installation instruction. Anchoring into Wood/Post: Use 1/4" Wood Screws. There are 1/4" (0,63cm) dis. holes provided in the frames for proper anchoring. , & OVER THE BEAMS AND INTO THE GROUND Arrow Anchoring Kit: (Model No.
Hardware WP 11 Remove from bag of screws and save for the last step 65103 #8-32 He× Nut (236) 65900A #10Bx1/2" (13mm) Black Screw (8) (Packed with Screws) 65923 #8-32x3/8" (10mm) Bolt (236) 65004 #8Ax5/16" (8mm) Screw (416) 66045 Handle (2) 66646 Washer (491) (13 sheets of 40) 65109 #8-32 Acorn Nut (4) (Packed with Screws) 67468 Peak Cap (6) (Arrow Logo) / 66769 Door Slide (4) 66382 Lower Door Guide (4) 67545 21' Weather Stripping (1) 66183 Roof Trim Cap (2 right & 2 left) 67293 10' Weather
Parts List WPI2 Assembly Part Part Quantity Check Key No.
Assembly by Key No.
• • • • ® Parts Needed For ® Step 1 Floor Frame Assemblies 8934 Ramp (1) 9367 Front Floor Frame (2) 8936 Rear Floor Frame (2) 10392 Side Floor Frame (4) SV14 The front floor frame is made up of three pieces. The side floor frames and the rear floor frame are made up of two pieces. The holes in these pieces will align when the pieces are positioned with correct amount of overlap. The illustrations below show the proper overall length for the sides, rear and front.
• k._l,p_+e- Z.,_It ®Frame Parts Needed For ® Assemblies 5986 Rear Wail Angle (2) + 10390 103+9Side RearWallChannel (2) ® Wall Channel (4) Q 10394 Side Wall Angle (4) SR15 The main frame pieces reinforce the walls. These pieces will later be installed in the center and at the top edge of the side walls and the rear wall. Proceed as follows: 1 Overlap the rear •, I ILl L 10389 10389 wall channel & pieces as shown in the figure and fasten the two pieces together with eight bolts as shown.
® Parts Needed For ® Step 3 @ 10397 Roof Beam (8) Roof Beam Assemblies SV16 The roof beams join the two gables and support the roof panels. The main roof beam is made up of four pieces overlapped back to back at the center. The left and right roof beam assemblies are made up of two pieces. Hint: These pieces are force-fitted, so you may have to press hard to join them together. 1 10397 Place one end of a roof beam inside another roof beam so that the 142 3/8" six holes in each piece align.
• Step 4 Parts Needed For ® Door Track Assembly • 6403 Door Track Splice (1) • 9366 Door Track (2) A17 NOTE: Door Track Splice (painted part) The door track assembly supports the sliding doors and reinforces the front wall. It is made up ofthree pieces. 6403 1 Using the door track splice, (painted), join the door track (galvanized) pieces end-to-end as shown. 9366 :2 Insert four screws from the under- 9366 side only.
® Parts Needed For • Step 5 Floor Frame • Front Floor Assembly (1) • Side Floor Assembly (2) • Rear Floor Assembly (1) SWI8 RIGHT, REAR 1 Place the floor frame pieces that 8936 you assembled earlier on the foundation. Assemble the fourcorners of the floor frame using two screws at each corner as shown. At the front corners fasten bolts through the bottom with nuts on top. from 9367 L 2 Measure the floor frame diago- nally. When the diagonal measurements are equal, the floor frame is square.
® Parts Needed For ® Step 6 • 6515 Wail Panel (2) • 9373 Front Wall Panel (2) • 6514 Corner Panel (4) Corners SRI9 NOTE The remainder of the building assembly requires many hours and more than one person. Do not continue beyond this point if you do not have enough time to complete the assembly today, A partially assembled building can be severely damaged by light winds, Wide Side REAR 6514 Each screw and bolt in the wall requires a washer.
® Parts Needed For • Step 7 Top Frames • Door Track Assembly (1) • Rear Wall Angle Assembly • Side Wall Angle Assembly WP20 The top frame pieces give rigidity to the walls and provide a surface for attaching the gables which support the roof. I Fasten the rearwall angle across the inside top of the rear wall using so rews. 2 Fasten the sidewall angles across the inside top of the side panels using screws. Side wall angles must overlap rear wall angle in corners.
® Parts Needed For • Step Mid Frames • Rear Wall Channel Assembly • Side Wall Channel Assembly (1) (2) WP21 The mid frame pieces give rigidity to the side and rear walls. 1 Fasten across the rear the middle wall channel of the rear wall using screws. 2 Fasten the side wall channels across the middle of the side panels using screws. Fasten overlaps in rear corners with bolts and nuts, at two locations. See the figure.
® Parts Needed For • Step 9 Wall Panels • 6515 Wall Panel (8) $1_2 Each wall panel has a crimped rib on one side, The crimped rib should go under the rib of the panel that follows it. Underneath Crimped Rib __ 1 Locate all of the wall panels set each one alongside and 6515 the building. 2 Fasten the wall panels at the top Detail Showing Center of Panel Screwed to Wall Channel and bottom with screws. 3 Fasten the center of each panel to the wall channel with screws.
® Parts Needed For ® Step 1 Front Channel/Door • 9369 Door Jamb (2) • 9365 Front Wail Channel (2) Jamb S023 r The door jambs reinforce the door opening and provide an attractive trim. Follow these steps for both doorjambs. 9365_ 1 Fasten the front wall channels in their positions between the end of the side wall channel and the cor- INSIDE OF BUILDING ner panel using screws. Do not put a screw in the hole at the end behind the door opening at this time.
• 6108 Large Right Gable (2) eel09 Large LeftGable(2) ® Parts Needed For ® Step 11 c.u_ A,,_ui_, @@6114 (2)6115 small S mall Left RightGable Gable(2) @ 6085 Roof Beam Bracket (4) WP24 The gables go on top of the front and rear walls to support the roof beams. Green EdgeTrim (Plastic Piece) NOTE The gables are packed nested together and might be mistaken as one piece. Carefully separate them before continuing.
• Left Gable Assemblies ® Parts Needed For ® Step 12 (2) O RightGableAssemblies (2) Gab|es/RoofBeams ®S,og,e .oof Be.mA..emb.e.(=) • 6636 Gable Brace (2) WP25 1 Lift and fasten a right and left gable, under angle at corner, to the door track and rear wall angle with so rews. Hint: On the front gable, leave out 2 screws closest to center gable leg. On the rear gable, use a bolt and nut at the overlapping rear wall angle. 2 Fasten the single roof beam to the outer gable leg as shown bolts.
Step 13 ,Roof PartsBeam/Braces Needed For ® .Mainaoo, ® 6227 Roof BeamAssemb,y Beam Brace (2) (l) WP26 1 Fasten the track supports to the front gable assembly only, as shown. 2 Wrap the weather stripping tape around the two joined edges of the large left and right gables. See diagram. Cut the weather stripping to length and repeat on next gable set. Track Supports 6228 3 Spread the two halves of the double roof beam and fasten to the gable brace of the front gable.
® Parts Needed For ® Step 14 RightRoofP.. l WP27 Installing the roof panels is best done with a step ladder. Install the first roof panel at the back right corner of the building. Each screw and bolt in the roof requires a washer. NOTE Measure the building diagonally again and make adjustments to make sure the building is square and level. This will make the roof m m m panels fit better, and holes will align. Don't anchor the floor frame.
• _,_'_- L_IL ep 15 Parts Needed For • • 10511 Left Roof Panel (1) mdg c.p. a P..ol. .000.,oooco , , • 6538 Roof Panel (2) WP28 I Install a left roof panel 10511 at the left rear corner of the roof. Screws To Roof Beam 2 Cut 28 short 3"(7,6cm) strips offthe small roll of weather stripping tape, and put them aside. Cover the joint at the peak with weather stripping tape, large roll. Unroll the tape and press it down over the opening atthe ridge as you install each roof panel.
Step 16 ® Parts Needed For ® • 6538RoofPanel(2) Riag c.p a ,,oooo , ooco , , WP29 1 install the second ridge caps 6868 overlapping the first ridge caps while installing two roof panels 6538. Hint: The bolts on the ridge cap need to be left loose to move the ridge cap to the side and overlap the ribs of the next roof paneL Cover the notched areas of the roof panels with strips of weather stripping tape and continue weather stripping the ridge.
@ 6538 St e p 17 . PartsNeeded For ® Ridge Caps & Panels Roof Panel (2) @ 10510 Right Roof Panel (1) @,8,9 RidgeCap(3) ®10511 Left Roof Panel (l ) WP30 1 Install the third ridge Reducing Large Gable Bulge Loosen eight bolts and nuts shown. Apply pressure with one hand at the peak of the gable and tighten bolt #1. Keeping pressure on the gable work down the slope tightening each bolt. Excess material will overlap smaller gable at seam.
• Parts Needed For • Step 1 RoofT i • 6014Side RoofTrim(2) O 6015 Side RoofTrim (4, WP31 1 Attach the side roof trim to the lower end of the roof panels on each side of the building using screws at each panel overlap. NOTE A single screw fastens both trim pieces at the overlap. 2 Using your thumb and index fin- ger, overbend the bottom flange of the roof panel rib atthe corner inward enough so the right and left roof trim caps fit onto right and left corners.
03719 DoorHandleBrace(2) l"_;Pdr_ ® Door Parts Needed For ® Assembly •Q 1047s mgmand LeftDoors(2) 10497 Horizontal Door Brace (4) Q6278 Vertical Door Brace (2) S032 The steps on this page tell how to assemble the right door. You will perform exactly the same procedures for the left door, Each bolt and screw in the door requires ceed as follows: a washer. Pro66045 1 Attach the door handle brace and handle to the door / 3719 _ 66045 with 1 bolt as shown. Don °t tighten the bolt yet.
® Parts Needed For ® Step 2 Doo_ Installation • Right OoorAssemNy (1) ®Le,tDoo, A,,emb,y(,, &Adjustment SQ33 Gable Hodzontal Door Brace Door Track DoorSlide 1 From inside the building, put the bottom of the right door assembly (on your left when you are inside the building) behind door jamb into the front frame track. 2 Position the top of the door so that the holes in the door line up with the holes in the door slides.
SOME FACTS ABOUT RUST S034 SOME FACTS ABOUT RUST Rusting is a natural oxidizing process that occurs when bare metal is exposed to moisture. Problem areas include screw holes, unfinished edges, or where scrapes and nicks occur in the protective coating through normal assembly, handling and use. Identifying these natural rusting problem areas and taking some simple rust protection precautions can help to stop rust from developing, or stop it quickly as soon as it appears. 1.