User's Manual

2
Owner's ManualOwner's Manual
Owner's ManualOwner's Manual
Owner's Manual
Before beginning construction, check local building codes regarding footings, location
and other requirements. Study and understand this owner's manual.
Important information and helpful tips will make your construction easier and more
enjoyable.
Assembly Instructions:Assembly Instructions:
Assembly Instructions:Assembly Instructions:
Assembly Instructions: Instructions are supplied in this manual and contain all
appropriate information for your building model. Review all instructions before you begin,
and during assembly, follow the step sequence carefully for correct results.
FF
FF
F
oundaounda
oundaounda
ounda
tion and tion and
tion and tion and
tion and
AncAnc
AncAnc
Anc
horhor
horhor
hor
ing:ing:
ing:ing:
ing: Your storage building must be anchored to prevent wind
damage. A foundation is also necessary as a base in order to construct a square and level
building. Anchoring and foundation materials are not included with your building. We
recommend the combined use of an
Arrow Floor Foundation Kit Arrow Floor Foundation Kit
Arrow Floor Foundation Kit Arrow Floor Foundation Kit
Arrow Floor Foundation Kit and an
Arrow Arrow
Arrow Arrow
Arrow
AncAnc
AncAnc
Anc
horing Kithoring Kit
horing Kithoring Kit
horing Kit as an effective method of securing your building to the ground (Available
by mail order or at your local dealer) or you may construct the foundation and anchoring
system of your choice. Your assembly instructions provide information on a few methods
commonly used to secure and level a storage building.
PP
PP
P
arar
arar
ar
ts and Pts and P
ts and Pts and P
ts and P
arar
arar
ar
ts List:ts List:
ts List:ts List:
ts List: Check to be sure that you have all the necessary parts for your
building.
•All part numbers can be found on the parts. All of these numbers (before the -) must agree with the
numbers on the parts list. The parts list is located on page 12.
•If you find that a part is missing, include the model number of your building and contact:
Arrow Group Industries, Inc. Customer Service DepartmentArrow Group Industries, Inc. Customer Service Department
Arrow Group Industries, Inc. Customer Service DepartmentArrow Group Industries, Inc. Customer Service Department
Arrow Group Industries, Inc. Customer Service Department
Route 50 East Breese, Illinois 62230Route 50 East Breese, Illinois 62230
Route 50 East Breese, Illinois 62230Route 50 East Breese, Illinois 62230
Route 50 East Breese, Illinois 62230
1-800-851-10851-800-851-1085
1-800-851-10851-800-851-1085
1-800-851-1085
•Separate contents of the carton by the part number while reviewing parts list. The first few steps
show how to join related parts to make larger sub assemblies which will be used later.
•Familiarize yourself with the hardware and fasteners for easier use during construction. These are
packaged within the carton. Note that extra fasteners have been supplied for your convenience.
BEFORE BEFORE
BEFORE BEFORE
BEFORE
YY
YY
Y
OU BEGINOU BEGIN
OU BEGINOU BEGIN
OU BEGIN
........
........
....
A2