Instructions / Assembly
21
You will need for this page:
Side Wall 
Channel
2
10886
21AP
Carefully position the Rear Wall Assembly 
in place at the rear of the building and secure 
to  Side Frame with one Large Screw per 
side as shown. 
1
2
Slide one end of the Front and Rear Side 
Wall Channel behind the Corner Panel 
and secure with a Large Screw. Secure the 
other end with a Large Screw when done. Repeat 
for the other Front and Rear Side Wall Channel.
(QTY: 4)(QTY: 2)
Assemblies from Step 2:
•  Rear Wall Assembly
10886
10886
10886
LS LS
10’x10’ (3,0 m x 3,1 m)
building shown.
If you purchased a Door Kit, skip this page and move on to page 22.
Step 5: Rear Wall Install










