Instructions / Assembly
31
31H
An Awl may be used to help 
align holes that are only slightly 
misaligned. Take care not to bend 
or warp the metal, and always practice 
proper tool safety.
2
1
3
4
5
7
8
6
(QTY: 24)
(QTY: 8)
Right End
2
8578
Washer
Bolt
Nut
GABLE
You will need for this page:
LEAVE THESE HOLES OPEN
FASTEN TO NEXT PANEL
2
1
3
4
5
7
8
LEAVE THIS HOLE OPEN
6
LEAVE THIS HOLE OPEN
Secure the End Panel to the Main Roof Beam 
by placing a Small Screw in hole #1 (from the 
diagram below). Carefully remove the Gable 
Edge Trim once the Panel is in position.
1
2
Fasten Panel to Gable by placing Small  Bolts 
and Nuts through holes #2 - #7. Fasten the 
holes in order.
Work one corner at a time. Be sure 
to fi nish a corner before moving on to 
the next one.
3
Secure the Panel to the outer Roof Beam by 
placing a Small Screw in hole #8. Repeat for 
other three End Panels.
Left End
2
8579
If Roof Beam holes do not line up 
with Roof Panel holes, shift the 
building from left to right. If this does not 
help, your building may not be level. Shim 
the corners until holes line up.
8578
8579
8578
8579
SBSS
10’x10’ (3,0 m x 3,1 m) 
building shown.
Step 10: End Panels










