Owners manual

40
You will need for this page:
Step 17: Continued
Finish Weather Stripping the roof and cut the tape just past the end of the roof. Fold
end of tape under roof edge.
7
Attach Short Ridge Cap with four (4) Java Bolts and Nuts. DO NOT secure end of
Ridge Caps until Peak Caps are in place.
Continue to apply weather stripping.
DO NOT secure end of Ridge Caps
until Peak Caps are in place.
(QTY: 44)
(QTY: 4)
Ridge Cap
1
10711
7571
7571
8
On both sides of the building, secure the bottom of Roof Panels to the Side Wall Angles
with Java Screws.
40W
CUT
DO NOT fully tighten Ridge Cap bolts until
you have both Ridge Cap bolts in place.
This will ease assembly. Bolts must be fully
tightened before moving on to the next page.
JS JB
6
7
8
8
10711
Install Roof Panels #9 and #10.
Roof Panel
2
7571
5
5