Installation Guide
6
Step 1: Floor
11
11M
You will need for this page:
The Front and Rear Floor Section should
be aligned with the Front and Rear Floor
Channels as shown.
10742
10741
Floor Channels overlap as shown.
SB
SB
SB
10744
SB
10744
10744
10744
10742
10742
10741
10743
SS
SS
SS
SS
(QTY: 4)
SB
10744
Floor Section
4
10743
F/R Floor
Section
1
10741
1
F/R Floor
Channel
10742
Side Floor
Channel
2
(QTY:5)
SS
1
3
2
2
SS
SS
4
4
SB
10744
Do not tighten Bolts until
after Floor is square.
Attach one (1) Front/Rear Floor
Section to a Front/Rear Floor
Channel securing with one (1)
Sand Screw as shown.
1
Attach Side Channels securing
with one (1) Sand Screw at
each corner.
2
Slide four (4) Floor Sections into the Side Channels one (1) at a time. Secure in the
middle using four (4) Sand Bolts and Nuts as shown.
3
Secure ends of Floor Sections to the Side Channels using two (2) Sand Screws as
shown above.
4