At this time, measure diagonally to ensure the building is
square. The building should be square at the base and at
the top. This will make Roof Panels t better and holes
will better align.
Be sure to carefully follow the Roof Panel
Placement Order Diagram on this page.
Read through all of Step 7 before beginning Roof Assembly.
Whenever a crimped rib and an uncrimped rib meet,
place the crimped rib UNDER the uncrimped rib.
Crimped Rib
Uncrimped Rib
The building is square when diagonal
measurements are equal.