Installation Guide

6
Step 7: Roof
22
22M
You will need for this page:
Right Roof
Panel
2
10730
Left Roof
Panel
2
80061
An Awl may be used to help align holes that are
only slightly misaligned. Take care not to bend
or warp the metal, and always
practice proper tool safety.
Washer
Bolt
Nut
GABLE
If Roof Beam holes do
not line up with Roof
Panel holes, shift the
building from left to right.
If this does not help,
your building may not be
level. Shim the corners
until holes line up.
Secure each of the four (4) Roof End Panels to the Roof
Beam and the Side Wall Angles by placing one (1)
Java Screw in hole #1 and one (1) Java Screw in hole
#2 (see diagram below). Carefully remove the Gable
Edge Trim once the Panels are in position.
1
2
Fasten the back Roof End Panels to the
Gables by placing three (3) Sand Bolts
and Nuts through holes #3 - #5. Fasten
the holes in order. Fasten the front Roof
End Panels using one (1) Sand Bolt and
Nut at the bottom hole only.
3
Finish securing front Roof End
Panels with Gable Decor to Gables
using four (4) Java Bolts and Nuts as
shown above.
Work one corner at a time. Be
sure to nish a corner before
moving on to the next one.
(QTY: 8)
SB
(QTY: 8)
JS
When securing the Gable Decor, be
careful not to scratch the paint. Do not
use a drill to tighten the Nuts. Instead, use
a No. 2 Phillips Screwdriver to hold the
Bolt in place and a Nut Driver or Wrench
to tighten the Nut.
Gable Decor
1
66820
10730
10730
80061
80061
SB
SB
SB
SB
JB
JB
JB
JB
JS
JS
JS
JS
4
5
2
LEAVE THESE HOLES OPEN
LEAVE THESE HOLES OPEN
3
1
(QTY: 4)
JB
66820
2
3
1