01M 01L 718820913 Owner’s Manual & Assembly Guide www.arrowsheds.com Model No. Gloves must be worn at all times to reduce risk of injury! DSM42 4’ x 2’ Nominal Size Customer Service: 1-800-851-1085 or assist@arrowsheds.com BUILDING DIMENSIONS Approx. Size † 4’ x 2’ 1,2 m x 0,8 m † Storage Area 11 Sq. Ft. 71 Cu. Ft. 2 1,0 m 2,0 m3 * See Inside for Detailed Safety Information.
SAFETY PRECAUTIONS... 02A Safety precautions MUST be followed at all times throughout the construction of your building! Care must be taken when handling various pieces of your building since many contain sharp edges. Please wear work gloves, eye protection and long sleeves when assembling or performing any maintenance on your building. Practice caution with the tools being used in the assembly of this building. Be especially familiar with the operation of all power tools.
ASSEMBLY TIPS & TOOLS 03A Watch the Weather Closely: Be sure the day you choose to install your building is dry and calm. Do NOT attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Use Teamwork: Two or more people are required to assemble your building. One person can hold the parts or panels in place while the other person fastens them together and handles the tools. This makes the process of assembling your building faster and safer.
04A FREQUENTLY ASKED QUESTIONS Q. How long will it take to assemble the building? A. Assembly time depends on a variety of factors, including roof design, tools available, DIY skill and the pace at which you work. Guidelines for each shed assembly are approximate AFTER completion of the base, and assume two or more people working on the assembly. Generally, you should plan on at least one day working with someone who can assist you; again, after constructing the base.
05A Q. What kind of base do I use? A. You can: •Use an Arrow Base Kit •Pour a concrete slab •Build a wood deck/floor (use exterior-grade plywood) •Use patio blocks •Build on crushed gravel, dirt or grass Arrow provides a base kit accessory that is an option for most building sizes. If you are building a wood deck/floor, an Arrow floor frame kit on top of your deck/floor assembles in minutes and provides a floor frame suitable for a 5/8” exterior-grade plywood floor (not included).
Q. What if the rear wall angle and channels are too large to fit inside of the rear wall panels? A. Check the dimensions of wall assemblies. They should be slightly smaller than the floor 06A frames. Lay the assemblies on top of the rear floor frame and pull them up to the top of the wall panels causing the corner panels to stand erect and not lean inward. Caution: Be careful to not scratch the panels on the way up. Q. The wide rib always overlaps the crimped rib. Is there ever an exception? A.
HARDWARE LIST... Key No. Part No. Part Description Qty.
08M PARTS LIST... Key No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 Part No.
Floor Walls 25 8 22 7 24 27 13 23 1 21 14 2 7 8 11 24 23 7 7 22 13 26 1 18 30 17 31 12 6 6 29 15 10 ASSEMBLY BY KEY NO.
ASSEMBLY OVERVIEW 10M Build the Floor Frame Install Corner Panels, Wall Angles, Wall Channels, Door Jamb and Front Header Install Wall Panels Attach Gables and Roof Beams Install Roof Panels, Decorative Gable Piece, Ridge Cap, Side Trim, and Corner Caps Install Doors Shed is now complete.
Step 1: Floor You will need for this page: SS SB 10741 1 10742 2 10743 1 F/R Floor Channel Side Floor Channel F/R Floor Section (QTY:5) (QTY: 4) 11M 2 1 Attach one (1) Front/Rear Floor Section to a Front/Rear Floor Channel securing with one (1) Sand Screw as shown. 10742 10744 4 Floor Section The Front and Rear Floor Section should be aligned with the Front and Rear Floor Channels as shown. SS SS 1 SS 10741 10743 2 Attach Side Channels securing wtih one (1) Sand Screw at each corner.
Step 1: Continued You will need for this page: SB (QTY: 2) 5 6 SS (QTY:5) 10744 1 Floor Section 10743 1 10741 1 F/R Floor Section F/R Floor Channel Slide Floor Section and Front/ Rear Floor Section into place. Secure using two (2) Sand Bolts and Nuts at the middle. Secure ends of Floor Section to the Side Channels using two (2) Sand Screw as shown above. 6 12M SS SS 10744 5 SB SB 10743 7 10741 SS SS SS 6 7 Attach Front/Rear Floor Channel using three (3) Sand Screws as shown.
Step 2: Front Corners and Door Jamb 13M You will need for this page: JB (QTY: 6) 1 10716 1 Right Door Jamb 10726 2 80057 1 Front Corner Panel Left Door Jamb Attach the Front Corner Panels to the Right and Left Door Jambs using three (3) Java Bolts and Nuts for each Panel.
Step 3: Corners and Wall Channel You will need for this page: SS SS (QTY: 12) (QTY: 2) 10701 2 10739 1 10740 2 Assemblies from Step 2: Rear Corner Panel Rear Wall Channel Side Wall Channel 14M • Front Right Corner Assembly • Front Left Corner Assembly JS 4 (QTY: 4) 1 Attach the Rear Corner Panels to the Floor Frame using two (2) Sand Screws for each Panel. 2 Attach the Rear Wall Channel to the Rear Corner Panels using one (1) Sand Screw in each Panel.
Step 4: Walls You will need for this page: SB SS (QTY: 46) (QTY: 7) 15M Whenever a crimped rib and an uncrimped rib meet, the crimped rib should be placed UNDER the uncrimped rib if possible. 10725 4 Crimped Rib Wall Panel JB Uncrimped Rib (QTY: 2) 1 2 3 4 Working one (1) side at a time, lift a Wall Panel into place and secure to the middle Wall Channel with four (4) Sand Screws, and Sand Bolts and Nuts where ribs overlap, as shown. Be sure to have ribs placed correctly.
Step 5: You will need for this page: SS JS (QTY: 22) 1 (QTY: 4) 16M Wall Angles and Header 10729 1 10731 2 Rear Wall Angle Side Wall Angle 10732 1 Front Header Attach the Side Wall Angles with six (6) Sand Screws for each Angle to the top of the Side Walls. Place the Rear Wall Angle on the top of Rear Wall, under the Side Wall Angles at corners. Secure with ten (10) Sand Screws. 10731 10731 10731 All SS fasteners.
Step 6: Gables You will need for this page: SS (QTY:6) 10735 1 Left Gable 10734 1 17M 69835 2 Edge Trim Right Gable GABLES ARE STACKED TOGETHER DURING SHIPPING AND MAY BE MISTAKEN FOR ONE GABLE! SEPARATE GABLES BEFORE CONTINUING. 69835 Install Edge Trim to cover Gable Edge BEFORE doing ANY work with Gables. Failure to do so could result in injury. Edge Trim MUST cover Gable edge. 1 Cut Edge Trim in half to make four (4) Edge Trim pieces. Install Edge Trim to top edge of Gables as shown.
Step 6: Continued You will need for this page: SS SB (QTY: 2) 3 10735 1 Left Gable (QTY:6) 10734 1 Right Gable 10733 2 Gable Brace 18M 67923 1 Weather Stripping Working one (1) Gable at a time, attach the Front Gables to the Header with six (6) Sand Screws as shown. Gable must fit UNDER Side Wall Angle at corner. 4 To secure Left and Right Gables together, position the Gable Brace as shown to the right and insert a single Sand Bolt and Nut through the second hole from the bottom only.
Step 6: Continued You will need for this page: SB (QTY: 8) 10738 2 Roof Beam 9204 2 Roof Beam Brace 6 Position the Roof Beams at the top of Gables as shown and attach using two (2) Sand Bolts and Nuts on each side of Roof Beams. 7 Attach the angled end of Roof Beam Brace to the Gable with one (1) Sand Bolt and Nut as shown. 8 Rotate to align with Roof Beam and secure to Roof Beam with one (1) Sand Bolt and Nut as shown. Repeat for opposite side.
Roof Install Prep Page 20M Read through all of Step 7 before beginning Roof Assembly. At this time, measure diagonally to ensure the building is square. The building should be square at the base and at the top. This will make Roof Panels fit better and holes will better align. Be sure to carefully follow the Roof Panel Placement Order Diagram on this page. Uncrimped Rib Crimped Rib Whenever a crimped rib and an uncrimped rib meet, place the crimped rib UNDER the uncrimped rib.
Step 7: Roof You will need for this page: JS 10730 2 SB (QTY: 8) 21M Left Roof Panel Right Roof Panel (QTY: 8) JB (QTY: 4) 1 2 Secure each of the four (4) Roof End Panels to the Roof 3 1 SB LEAVE THESE HOLES OPEN Gable Decor An Awl may be used to help align holes that are only slightly misaligned. Take care not to bend or warp the metal, and always practice proper tool safety.
Step 7: Continued You will need for this page: JS JB (QTY: 16) (QTY: 4) 4 5 10727 1 Roof Panel Attach each of the two (2) middle Roof Panels (#5 - #6) to the Roof Beam and the Side Wall Angle using eight (8) Java Screws as shown. 10728 1 67293 1 10737 1 Roof Panel Weather Stripping Ridge Cap 4 JS JS 10728 Seal the roof ridge by applying Weather Stripping across the entire roof ridge as shown. Leave holes on ribs open.
Step 8: Roof Trim You will need for this page: JB JS (QTY: 4) (QTY: 4) 23M 66447 2 10736 2 66183L 2 66183R 2 Peak Cap Side Roof Trim Corner Cap, Left Corner Cap, Right JS JB (QTY: 4) 1 1 Slide the Peak Cap legs under Ridge Cap and secure at each end with two (2) Java Bolts and Nuts. 2 Position the Side Roof Trim as shown and secure with two (2) Java Screws. Leave each end hole open. 3 Position the Left and Right Roof Trim Caps as shown and secure with a Java Screw.
Step 9: Door Assembly You will need for this page: SS (QTY: 1) (QTY: 12) 10782 1 Door Panel 10718 2 Horizontal Door Brace Start assembly by sliding the Door Handle Brace into the middle of the Door and securing it with four (4) Sand Screws. Then attach the Horizontal Door Braces to each end of Door using two (2) Sand Screws on each brace. Once installed, attach Adhesive Pad between leg of Door Handle Brace and Door.
Step 9: Continued You will need for this page: FB LNB (QTY: 2) (QTY: 6) JB (QTY: 6) 66609 2 Hinge 25M 66809 1 66054 1 Locking Handle Right 3 4 3 5 6 66609 FB Latch 66811 1 Handle Backplate 66812 2 Hinge Plate Decor Attach Hinges to Door using six (6) Flat Head Bolts. Install Locking Handle and Handle Backplate using two (2) Long Bolts. Secure Backplate using two (2) Java Bolts and Nuts. Attach Latch Handle. to Locking Tighten set screw in Latch.
Step 9: Continued You will need for this page: FB (QTY: 6) NEED AT LEAST TWO PEOPLE TO PERFORM THIS STEP! 8 Hold Door up to Door Jamb and align holes on Hinges with holes on Door Jamb. Using six (6) Flat Head Bolts, secure Door to Door Jamb.
ANCHORING OPTIONS... 27M IMPORTANT: • Doors must hang and swing level before anchoring building. • Anchor your building at this time. See below for details on anchoring. • Please take a moment to ensure that the building is installed in accordance with these instructions and with all applicable regulations. Anchoring Down The Building The entire floor frame MUST be securely anchored once the building is erected. Below are recommended ways of anchoring.
CARE & MAINTENANCE... 44A Exterior Care: For a long lasting finish, clean and wax the exterior surface. We recommend washing with a mild soap solution. DO NOT use power washing to clean your shed. Using a spray automotive type wax periodically on the exterior is highly recommended if you are in a high humidity or coastal climate region. Combustibles and corrosives must be stored in air tight containers designed for chemical and/or combustible storage.
ARROW ACCESSORIES... 28M ANCHOR KITS Model No. AK4 Anchor Kit contains heavy-duty steel augers, 60' (18 m) of steel cable and 4 cable clamps. No digging or concrete pouring, just insert cable under roof, over roof beams, into augers and twist augers into the ground. For buildings larger than 10'x9' (3,0 m x 2,6 m), use 2 kits. TOOL HANGING RACK Model No. TH100 The perfect tool organizer.
ASSEMBLY NOTES 30 46A
ASSEMBLY NOTES 31 46A