Owners manual
6
Step 7: Continued
22
22M
You will need for this page:
10727
Roof Panel
1
10728
Roof Panel
1
(QTY: 16)
JS
4
Attach each of the two (2) middle Roof
Panels (#5 - #6) to the Roof Beam and
the Side Wall Angle using eight (8) Java
Screws as shown.
Weather Stripping Tape should be applied in
a continuous strip along the length of the roof.
Seal the roof ridge by applying Weather
Stripping across the entire roof ridge as
shown.
5
Leave holes on ribs open.
67293
Weather
Stripping
1
10737
Ridge Cap
1
(QTY: 4)
JB
Attach the Ridge Cap to the Roof using
four (4) Java Bolts and Nuts as shown
to the left. Do not place Bolts in the end
holes of the Ridge Cap.
6
DO NOT fully tighten Ridge Cap
Bolts until Peak Caps are installed.
This will ease assembly.
10727
10728
JS
JS
JB
JB
4
6
5
10737