Installation Guide

6
Step 1: Floor
The Front and Rear Floor Section should be aligned
with the Front and Rear Floor Channels as shown.
12
12AC
You will need for this page:
10807
10741
Floor Channels overlap as shown.
10807
1074110743
SS
SS
SS
SS
(QTY: 13)
SB
10744
Floor Section
13
10743
F/R Floor
Section
1
10741
1
F/R Floor
Channel
10807
Side Floor
Channel
2
(QTY: 11)
SS
1
2
2
Do not tighten Bolts until
after Floor is square.
Attach one (1) Front/Rear Floor
Section to a Front/Rear Floor
Channel securing with one (1)
Sand Screw as shown.
1
Attach Side Channels securing
wtih one (1) Sand Screw at
each corner.
2
Slide thirteen (13) Floor Sections into the Side
Channels one (1) at a time. Secure in the middle
using thirteen (13) Sand Bolts and Nuts as
shown.
3
Secure ends of Floor Sections to the Side
Channels using eight (8) Sand Screws as shown
below.
4
10807
10744
SB
SB
SB
SB
3
SS
SS
4
4
SB
SS
SS
SS
SS
SS
SS
SB
SB
SB
SB
SB
SB
SB
SB
SB
10744