Installation Guide
6
Roof Install Prep Page
22
22AC
At this time, measure diagonally to ensure the building is
square. The building should be square at the base and at
the top. This will make Roof Panels fi t better and holes
will better align.
Be sure to carefully follow the Roof Panel
Placement Order Diagram on this page.
Read through all of Step 7 before beginning Roof Assembly.
Whenever a crimped rib and an uncrimped rib meet,
place the crimped rib UNDER the uncrimped rib.
Crimped Rib
Uncrimped Rib
The building is square when diagonal
measurements are equal.
10
7
9
FRONT
10730
10801
10799
10800
80061
80061
10800
10799
10801
10730
8
1
Roof Panel Placement Order
3
4
5
2
6
FASTEN TO WALL ANGLE WITH SCREWS
FASTEN TO ROOF BEAMS WITH SCREWS
DO NOT FOCUS
WEIGHT ON ROOF.
FASTEN TO NEXT PANEL WITH SCREWS
FASTEN TO RIDGE CAP