Installation Guide

31
You will need for this page:
Step 16: Window Assembly
Working one part at a time, insert Window Header Lower into slot of Gable aligning front
hole with bottom hole in Gable. This is to ensure the hole alignment with the Front Header
is correct.
1
2
Using two (2) Window Upright Outers back-to-back as shown, place in between Window
Headers Lower to gauge the gap.
Install Window Header Lower to top of Front Header using eight (8) Sand Screws in the
order shown. Be sure to leave specifi ed holes open. Repeat for other side.
3
31AI
Insert Window Header Lower
into slot of Gable.
Window
Header Lower
2
10869
(QTY: 16)
SS
10869
10869
10869
LEAVE HOLES OPEN
Front Hole
Front Hole
TOP VIEW
1
3
2
Window
Upright Outer
2
10845
10845
1
2
3
4
5
6
7
8