01AB 719380814 Owner’s Manual & Assembly Guide www.arrowsheds.com Model No. ELPHD64 6’ x 4’ Gloves must be worn at all times to reduce risk of injury! Nominal Size Customer Service: 1-800-851-1085 or assist@arrowsheds.com BUILDING DIMENSIONS Approx.† Size 6’ x 4’ 1,8 m x 1,2 m Storage Area 25 Sq. Ft. 155 Cu. Ft. 2 2,3 m 4,4 m3 * See Inside for Detailed Safety Information.
SAFETY PRECAUTIONS... 02A Safety precautions MUST be followed at all times throughout the construction of your building! Care must be taken when handling various pieces of your building since many contain sharp edges. Please wear work gloves, eye protection and long sleeves when assembling or performing any maintenance on your building. Practice caution with the tools being used in the assembly of this building. Be especially familiar with the operation of all power tools.
ASSEMBLY TIPS & TOOLS 03A Watch the Weather Closely: Be sure the day you choose to install your building is dry and calm. Do NOT attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Use Teamwork: Two or more people are required to assemble your building. One person can hold the parts or panels in place while the other person fastens them together and handles the tools. This makes the process of assembling your building faster and safer.
04A FREQUENTLY ASKED QUESTIONS Q. How long will it take to assemble the building? A. Assembly time depends on a variety of factors, including roof design, tools available, DIY skill and the pace at which you work. Guidelines for each shed assembly are approximate AFTER completion of the base, and assume two or more people working on the assembly. Generally, you should plan on at least one day working with someone who can assist you; again, after constructing the base.
05A Q. What kind of base do I use? A. You can: •Use an Arrow Base Kit •Pour a concrete slab •Build a wood deck/floor (use exterior-grade plywood) •Use patio blocks •Build on crushed gravel, dirt or grass Arrow provides a base kit accessory that is an option for most building sizes. If you are building a wood deck/floor, an Arrow floor frame kit on top of your deck/floor assembles in minutes and provides a floor frame suitable for a 5/8” exterior-grade plywood floor (not included).
Q. What if the rear wall angle and channels are too large to fit inside of the rear wall panels? A. Check the dimensions of wall assemblies. They should be slightly smaller than the floor 06A frames. Lay the assemblies on top of the rear floor frame and pull them up to the top of the wall panels causing the corner panels to stand erect and not lean inward. Caution: Be careful to not scratch the panels on the way up. Q. The wide rib always overlaps the crimped rib. Is there ever an exception? A.
HARDWARE LIST... Key Part No. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 Part Description 65103 65923-33 65923-32 65004-33 65004-32 66783 65958-32 66692 66810 66809 66054 66609 66183L 66183R 67236 Qty.
PARTS LIST... Key No. Part No.
ASSEMBLY BY KEY NO.
ASSEMBLY BY KEY NO.
ASSEMBLY OVERVIEW 11AB Build the Floor Frame Install Corner Panels, Side Angles, Rear Angles, and Door Jambs Install Wall Panels and Wall Channels Attach Header, Gables, and Roof Beam Install Roof Panel, Roof Trim, and Corner Cap Install Doors Shed is now complete.
CONSTRUCTING A BASE... 12AB No matter which of the options below you choose for a base, an ARROW ANCHORING KIT is recommended as an effective method of properly securing your building after assembly is complete. OPTION 1: Directly on ground (earth) Assemble your building directly on level ground (grass, dirt, rock, sand, etc.). Allow 1 - 2 hours for construction. OPTION 2: Wood Platform If you decide to build your own base, be sure to select the appropriate materials.
Step 1: Front Corners and Door Jamb 13AB You will need for this page: MGB (QTY: 8) 80057 1 Left Door Jamb 10716 1 Right Door Jamb 10839 2 Front Corner Panel Washers are to be used on painted parts only. Washers are not necessary on unpainted parts and there are not enough to use on every screw and bolt. 1 Attach the Front Corner Panels to the Right and Left Door Jambs using three (3) Meadow Green Bolts and Nuts (#1-3) for each Panel.
Step 2: Door Pre-Assembly You will need for this page: 1 TS SS (QTY: 2) (QTY: 24) 10856 2 Door Panel 10718 4 Horizontal Door Brace 2 Start assembly by sliding the Door Handle Brace into the middle of the Door and securing it with four (4) Sand Screws. Then attach the Horizontal Door Braces to each end of Door using two (2) Sand Screws on each brace. Once installed, attach Adhesive Pad between leg of Door Handle Brace and Door.
Step 3: Right Door Assembly 15AB You will need for this page: FB LNB (QTY: 2) (QTY: 6) 66609 2 Hinge 66809 1 Locking Handle Right 66054 1 Latch 1 2 3 4 1 66609 Attach Hinges to Door using six (6) Flat Head Bolts. Install Locking Handle using two (2) Long Bolts. Attach Latch Handle. to Locking Tighten set screw in Latch.
Step 4: Left Door Assembly You will need for this page: (QTY: 2) 1 2 66609 2 FB LNB (QTY: 6) Hinge 16AB 66810 1 Left Handle Attach Hinges to Door using six (6) Flat Head Bolts. Install Locking Handle using two (2) Long Bolts.
Step 4: Continued You will need for this page: 66808 1 SS Bottom Latch Spring (QTY: 8) 3 10721 1 66684 1 Door Stop Top Latch Spring 17AB Remove two (2) Screws from left side of Door Handle Brace and far left Screw from both top and bottom Horizontal Door Brace. Screws will be reused. 3 66684 Remove far left Screw from top and bottom Horizontal Door Brace to install Door Stop and Latch Springs. 3 10721 Remove Screws to install Door Stop.
Step 5: Floor Assembly You will need for this page: SS (QTY: 8) 10849 2 18AB 10850 2 Front/Rear Floor Frame Side Floor Frame Do NOT fasten your Floor Frames to your Base at this time. You will anchor your building after it is erected. Overlap Floor Frames as shown. Set Floor Frame with large holes on top at each corner. 1 Assemble the four (4) corners of the Floor Frame using two (2) Sand Screws at each corner as shown.
Step 6: Corner Panels You will need for this page: SS MGS (QTY: 6) 10701 2 Assemblies from Step 1: • Front Right Corner Assembly • Front Left Corner Assembly Rear Corner Panel (QTY: 4) 19AB Use one person to support the Corner while another secures the Panels. Do not leave the Corner unsupported until it is secure. 1 2 Attach the Rear Corner Panels to the Floor Frame using two (2) Sand Screws for each Panel. Be cautious when maneuvering and placing Panels.
Step 7: Wall Framing You will need for this page: MGS SS (QTY: 6) 1 2 3 (QTY: 4) 10841 1 Front Header 10851 1 10852 2 Rear Wall Angle Side Wall Angle 20AB Install Rear Wall Angle to Rear Corner Panels using two (2) Sand Screws as shown. Install the Front Header using four (4) Meadow Green Screws. Install both Side Wall Angles to Corner Panels using two (2) Sand Screws per Side Wall Angle, sliding the front end inside of the Front Header and the rear end under the Rear Wall Angle as shown.
Step 8: Wall Panels You will need for this page: 6155 2 10725 1 10836 4 Wall Panel Wall Panel 21AB FASTEN TO WALL ANGLES [ NO HARDWARE NEEDED FOR THIS STEP ] Wall Panel 1 Lay out all Panels in the positions shown below. Double check that you have the correct Panel in each location. FASTEN TO WALL CHANNELS (STEP 9) Use the diagram to the right when attaching Wall Panels. • Secure the top row to Wall Angles. • Secure the middle row to Wall Channels (Step 9). • Secure the lower row to Floor Frames.
Step 8: Continued 22AB You will need for this page: SS (QTY: 72) SB Corner Panels lay over Wall Panels. (QTY: 10) 2 Working one side at a time, lift the Panels into place and secure top and bottom of Panels with Sand Screws. 3 Place one (1) Sand Bolt and Nut through the center hole of the Panel where Panels overlap, as shown. Corner Panel Smaller Rib Spacing 2 6155 10725 6155 Place back Wall Panels as shown. 3 Place bolt through center hole where Panels overlap.
Step 9: Wall Channels You will need for this page: SS SS (QTY: 32) (QTY: 2) 10853 1 Rear Wall Channel 10854 2 Install Channels on inside of building. Side Wall Channel 10853 1 1 Install Rear Wall Channel by placing Sand Screws through all remaining holes in Rear Wall Panels. 10854 2 2 23AB Install Side Wall Channel by placing Sand Screws through all remaining holes in Side Wall Panels. 3 Insert screw where Channels meet.
Step 10: Gables You will need for this page: SB (QTY: 4) 1 7907 Left Gable 1 7906 1 Right Gable 7916 2 Gable Brace 24AB 69836 2 Edge Trim Install Edge Trim. Edge Trim (Plastic) Edge Trim MUST cover Gable edge. Install Edge Trim to cover Gable Edge BEFORE doing ANY work with Gables. Failure to do so could result in injury. 7916 7906 7907 7916 2 Install Gable Braces on both Gables using two (2) Sand Bolts and Nuts per Brace. Leg of Brace must face toward large end of Gable as shown.
Step 10: Continued You will need for this page: SS (QTY: 12) 3 Working one (1) Gable at a time, attach Gables to Side Wall Angles with six (6) Sand Screws per Gable as shown below. Gable must fit UNDER Rear Wall Angle at corner.
Step 11: Roof Framing You will need for this page: SB (QTY: 4) 1 10855 1 Roof Beam Attach Roof Beam to Gable Brace using two (2) Sand Bolts and Nuts per end as shown. Attach Roof Beam to Gable Brace through top two (2) holes.
Step 12: Window Assembly 27AB You will need for this page: SS Lower Window Header (QTY: 10) 1 10842 1 Attach Lower Window Header to the Front Header using ten (10) Sand Screws as shown. Leave holes #3, #5, #10, and #12 open at this time. 10842 Insert Lower Window Header into slot of Gable.
Step 12: Continued You will need for this page: (QTY: 4) 2 10845 2 SB LNB Window Upright Outer (QTY: 3) 10844 2 Window Upright Inner 28AB 10847 2 Window Support Angle Lower Secure Window Upright Inners together using three (3) Sand Bolts and Nuts as shown. SB 10844 10844 SB SB 3 Attach Window Upright Inner, Window Upright Outer, and Window Support Angle Lower to Lower Window Header using four (4) Long Bolts and Nuts. DO NOT TIGHTEN BOLTS AT THIS TIME.
Step 12: Continued You will need for this page: SS (QTY: 4) 29AB END VIEW 66830 2 66830 10844 Window 10847 4 Remove protective film from both sides of Window. 5 Insert Windows inside Window Header Lower. Place between Window Upright Inner and Window Support Angle Lower. 10842 Front 66830 66830 6 Secure Window Support Angle Lower to Window Header Lower using four (4) Sand Screws as shown. See diagram below.
Step 12: Continued You will need for this page: SB LNB (QTY: 4) 7 8 9 (QTY: 4) 10843 1 10848 2 Upper Window Header Window Support Angle Upper 30AB 7 Attach Window Header Upper and Window Support Angle Upper to window assembly using four (4) Long Bolts and Nuts as shown. DO NOT TIGHTEN BOLTS. 10843 Secure Window Support Angle Upper to Window Header Upper using four (4) Sand Bolts and Nuts as shown. LNB 10848 LNB 10848 Tighten all Bolts on Header Assembly.
Roof Install Prep Page 31AB Use the information on this page to complete step 13. If Roof Beam holes do not line up with Roof Panel holes, shift the building from left to right. If this does not help, your building may not be level. Shim the corners until holes line up. Measure the building diagonally again to make sure the building is square. The building should be square at the base and at the top. This will make roof panels fit better and holes will better align.
Step 13: Roof Assembly You will need for this page: SS SB (QTY: 6) (QTY: 10) 1 2 3 80083 1 10840 1 Left Roof Panel Right Roof Panel Working one (1) Panel at a time, secure Right Roof Panel to Header Assembly by placing one (1) Sand Screw in hole #1 (from the diagram below). Carefully remove the Gable Edge Trim once the Panel is in position. Fasten Panel to Gable by placing Sand Bolts through holes #2, #3, #4, #5, and #6. Fasten the holes in order.
Step 13: Continued You will need for this page: SS (QTY: 18) 4 10837 SB 2 LEAVE HOLES OPEN Roof Panel (QTY: 2) Attach Panels #3 and #4 in order given in the diagram on page 31. Use the diagram to the right while assembling the roof. FASTEN TO HEADER WITH SCREWS FASTEN TO ROOF BEAM WITH SCREWS An Awl may be used to help align holes that are only slightly misaligned. Take care not to bend or warp the metal, and always practice proper tool safety.
Step 13: Continued You will need for this page: SS SB (QTY: 12) (QTY: 2) 5 10838 1 LEAVE HOLES OPEN Roof Panel Attach Panel #5, use the diagram to the right while assembling the roof. FASTEN TO HEADER WITH SCREWS FASTEN TO ROOF BEAM WITH SCREWS FASTEN TO NEXT PANEL WITH BOLT AND NUT An Awl may be used to help align holes that are only slightly misaligned. Take care not to bend or warp the metal, and always practice proper tool safety. LEAVE HOLES OPEN Work one (1) Panel at a time.
Step 14: Roof Trim You will need for this page: MGS MGS (QTY: 8) (QTY: 4) 2 10846 Roof Trim 66183R 2 66183L 2 Right Roof Trim Cap Left Roof Trim Cap 1 Position Roof Trim and secure with eight (8) Meadow Green Screws. Do not fasten the last screw on each end. 2 Position and secure each Roof Trim Cap using one (1) Meadow Green Screw as shown.
` Step 15: Door Installment 36AB You will need for this page: FB SS (QTY:12) (QTY:4) 10702 1 Ramp Assemblies from step 3 and step 4: • • Right Door Assembly (1) Left Door Assembly (1) NEED AT LEAST TWO PEOPLE TO PERFORM THIS STEP! 1 Using three (3) Flat Head Bolts and Nuts per Door Hinge, secure Doors to Door Jambs. Door Jamb FB 1 Door SS SS 2 10702 SS SS 2 Fasten Ramp to Floor Frame using four (4) Sand Screws.
ANCHORING OPTIONS... 43A IMPORTANT: • • • • If you have swing doors, they must hang and swing level before anchoring building. Anchor your building at this time. See below for details on anchoring. If you have purchased a Floor Frame Kit, you should install it at this time. Please take a moment to ensure that the building is installed in accordance with these instructions and with all applicable regulations.
CARE & MAINTENANCE... 44A Exterior Care: For a long lasting finish, clean and wax the exterior surface. We recommend washing with a mild soap solution. DO NOT use power washing to clean your shed. Using a spray automotive type wax periodically on the exterior is highly recommended if you are in a high humidity or coastal climate region. Combustibles and corrosives must be stored in air tight containers designed for chemical and/or combustible storage.
ARROW ACCESSORIES... ANCHOR KITS TOOL HANGING RACK Anchor Kit contains heavy-duty steel augers, 60' (18 m) of steel cable and 4 cable clamps. No digging or concrete pouring, just insert cable under roof, over roof beams, into augers and twist augers into the ground. For buildings larger than 10'x9' (3,0 m x 2,6 m), use 2 kits. The perfect tool organizer. Twin 25 1/2" (64,8 cm) steel channels plus five heavy-duty snap-in hangers and a small tool holder for screwdrivers, pliers, etc.