Use and Care Manual
13
10866
Front/Rear
Floor Frame
4
You will need for this page:
Step 1: Floor Frames
Overlap two (2) Front/Rear Floor Frames as
shown and secure with four (4) Sand Bolts and
Nuts. Two (2) Sand Bolts and Nuts must enter
from bottom.
1
2
Assemble a second Front/Rear Floor Frame
Assembly by repeating Step 1. Check
that the fi nished length of the assemblies
is 95 7/8” (243,5 cm). Set aside for use in
Step 8.
Finished Length
95 7/8” (243,5 cm)
11 7/8” (30,2 cm)
Overlap Length
13AH
(QTY: 8)
SB
BUILD TWO (2) FRAMES
10866
10866
Bolts thru Bottom.
Bolts thru Top.
Washers are to be used on painted parts only.
Washers are not necessary on unpainted
parts and there are not enough to use on
every screw and bolt.