Owner's Manual
20
Roof Install Prep Page
20BL
Measure the building diagonally again to make
sure the building is square. The building should
be square at the base and at the top. This will
make roof panels fi t better and holes will better
align.
Whenever a crimped rib and an uncrimped rib meet,
place the crimped rib UNDER the uncrimped rib.
Crimped Rib
Uncrimped Rib
Be sure to carefully follow the Roof Panel
Placement Order Diagram on this page.
If Roof Beam holes do not line up with Roof
Panel holes, shift the building from left to right. If
this does not help, your building may not be level.
Shim the corners until holes line up.
Use the information on this page to complete steps 8 and 9.
The building is square when diagonal measurements are equal.
Roof Panel Placement Order
2
3
1
10558
10557
80011
FRONT