01BY 722630317 Owner’s Manual & Assembly Guide Model No. EZ6565LVCR EZ6565LVCRCC EZ6565LVCC EZ6565LVCCCR Gloves must be worn at all times to reduce risk of injury! www.arrowsheds.com EZ6565LVCREU EZ6565LVCRCCEU EZ6565LVCCEU EZ6565LVCCCREU 6’ x 5’ Nominal Size EZEE SHED TM Customer Service: 1-800-851-1085 or assist@arrowsheds.com BUILDING DIMENSIONS Approx.† Size 6’ x 5’ 1,8 m x 1,4 m Storage Area 25 Sq. Ft. 140 Cu. Ft. 2 2,3 m 4,0 m3 * See Inside for Detailed Safety Information.
GB: Assembly manual in additional languages available online. Scan QR code below to access. FR: Manuel de montage disponible en ligne dans d’autres langues. Pour y accéder, scannez le code QR ci-dessous. SP: Manual de montaje en idiomas adicionales disponible online. Escanee el código QR a continuación para acceder. DE: Montageanleitung in zusätzlichen Sprachen online verfügbar. Scannen Sie den QR-Code unten, um darauf zuzugreifen. IT: Manuale dell’assemblea in altre lingue disponibile online.
SAFETY PRECAUTIONS... 02CG Safety precautions MUST be followed at all times throughout the construction of your building! Care must be taken when handling various pieces of your building since many contain sharp edges. Please wear work gloves, eye protection and long sleeves when assembling or performing any maintenance on your building. Practice caution with the tools being used in the assembly of this building. Be especially familiar with the operation of all power tools.
ASSEMBLY TIPS & TOOLS 03A Watch the Weather Closely: Be sure the day you choose to install your building is dry and calm. Do NOT attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Use Teamwork: Two or more people are required to assemble your building. One person can hold the parts or panels in place while the other person fastens them together and handles the tools. This makes the process of assembling your building faster and safer.
04A FREQUENTLY ASKED QUESTIONS Q. How long will it take to assemble the building? A. Assembly time depends on a variety of factors, including roof design, tools available, DIY skill and the pace at which you work. Guidelines for each shed assembly are approximate AFTER completion of the base, and assume two or more people working on the assembly. Generally, you should plan on at least one day working with someone who can assist you; again, after constructing the base.
05A Q. What kind of base do I use? A. You can: •Use an Arrow Base Kit •Pour a concrete slab •Build a wood deck/floor (use exterior-grade plywood) •Use patio blocks •Build on crushed gravel, dirt or grass Arrow provides a base kit accessory that is an option for most building sizes. If you are building a wood deck/floor, an Arrow floor frame kit on top of your deck/floor assembles in minutes and provides a floor frame suitable for a 5/8” exterior-grade plywood floor (not included).
Q. What if the rear wall angle and channels are too large to fit inside of the rear wall panels? A. Check the dimensions of wall assemblies. They should be slightly smaller than the floor 06A frames. Lay the assemblies on top of the rear floor frame and pull them up to the top of the wall panels causing the corner panels to stand erect and not lean inward. Caution: Be careful to not scratch the panels on the way up. Q. The wide rib always overlaps the crimped rib. Is there ever an exception? A.
CARE & MAINTENANCE... 44A Exterior Care: For a long lasting finish, clean and wax the exterior surface. We recommend washing with a mild soap solution. DO NOT use power washing to clean your shed. Using a spray automotive type wax periodically on the exterior is highly recommended if you are in a high humidity or coastal climate region. Combustibles and corrosives must be stored in air tight containers designed for chemical and/or combustible storage.
HARDWARE LIST... 08BY Hardware Views by Key No. Key Part No. No. 1 2 3 4 5 6 7 8 9 10 11 12 65923 65103 65004 66646 66715 66718 66720 60H 66860 66847 66721 10280 Part Description Qty. Bolt (#8-32 x 3/8) (10 mm) Hex Nut (#8-32) Screw (#8AB x 5/16) (8 mm) Washer Sheet Door Handle Hinge Padlock Eyelet Corner Cap Peak Cap Vent Gable U-Nut (Door Clip) Corner Clip 15 15 129 2 1 2 2 4 2 4 4 8 The fasteners used in each step are shown actual size at the top of each page.
PARTS LIST... Key Part No. No.
ASSEMBLY BY KEY NO.
ASSEMBLY BY KEY NO.
ASSEMBLY OVERVIEW Build Side Wall Assemblies Build Rear Wall Assembly Build Front Wall Assembly Assemble Walls Install Gables and Roof Beams Build Roof Assemblies 12 12BY
ASSEMBLY OVERVIEW Install Roof Panels Install Trim Install the Door and you now have a finished shed 13 13BY
CONSTRUCTING A BASE... 14BY OPTION 1: Directly on ground (earth) Assemble your building directly on level ground (grass, dirt, rock, sand, etc.). Allow 1 - 2 hours for construction. OPTION 2: Wood Platform If you decide to build your own base, be sure to select the appropriate materials.
Step 1: Side Walls You will need for this page: 10307 6 10316 2 Panel Wall Panel Wall 1 15BY 10268 2 Corner Panel Make two (2) Side Wall Sections. 4 panels & 1 corner - each Be cautious when maneuvering and placing Panels. Once Panels begin to go up it is important to be able to finish in a timely manner to reduce the possibility of wind damage to your building.
Step 1: Continued 16BY MUST USE FLAT SOLID SURFACE. DO NOT SNAP ON GROUND OR GRASS Top Panel ALWAYS COVER THE ARROW 2 3 Raise Panel at Angle. Top Panel Bottom Panel Overlap Panels and Align Ends. maintaining pressure Always cover the Arrow. Bottom Panel 4 Hook Edge of Top Panel to Bottom Panel. 5 Bring Top Panel down flat while maintaining pressure in the middle to keep edge hooked. Apply pressure in area shown 6 Start in middle of assembly to snap Panels together.
Step 1: Continued 17BY You will need for this page: ARROW TO TOP (QTY: 6) 9 Install Corner Panel. 10 Cover Arrow on Corner Panel. CORNER PANEL 10268 10316 11 12 13 17 Use edge of surface, like your carton, to allow Corner Panel to hang down. Push down to snap Panels together working from the center in each direction . Attach Corner Panel to Wall Panel using three (3) washers and screws.
Step 1: Continued You will need for this page: 10261 2 IMPORTANT START ASSEMBLY AT CORNER PANEL Wall Channel 14 18BY Channel CORNER MUST BE AGAINST 45 DEGREE CUT ON CHANNEL Attach Wall Channel(Painted). ELEVATE PANELS TO MAKE INSTALLING WALL CHANNEL ASSEMBLY EASIER WALL CHANNEL (Painted) 15 10261 Align Wall Channel to Panel Ribs and pop into place at Corner. ARROW TO TOP ELEVATED PLATFORM 16 1. Angle Wall Channel Channel Continue aligning Channel and popping into place. 2.
Step 1: Continued IMPORTANT You will need for this page: 10255 2 Floor Channel 17 19BY 10280 4 START ASSEMBLY AT CORNER PANEL CORNER MUST BE AGAINST 45 DEGREE CUT ON CHANNEL Corner Clip Attach Floor Channel (Unpainted). ELEVATE PANELS TO MAKE INSTALLING WALL CHANNEL ASSEMBLY EASIER Channel Corner Panel CORNER CLIP 10255 ELEVATED PLATFORM 1. Angle Floor Channel Wall Panels FLOOR CHANNEL (UNPAINTED) 2. Continue to align Floor Channel onto Wall Panels Channel Wall Panels 3.
Step 2: Rear Wall You will need for this page: (QTY: 3) 10307 4 10316 1 Panel Wall Panel Wall ARROW TO TOP 1 20BY 10268 1 Corner Panel Make one (1) Be cautious when maneuvering and placing Rear Wall Section. Panels. Once Panels begin to go up it is important to be able to finish in a timely manner to reduce the possibility of wind damage to your building. MUST USE FLAT SOLID SURFACE. DO NOT SNAP ON GROUND OR GRASS.
Step 2: Continued You will need for this page: IMPORTANT 10262 1 START ASSEMBLY AT CORNER PANEL Wall Channel 5 21BY Channel CORNER MUST BE AGAINST 45 DEGREE CUT ON CHANNEL Attach Wall Channel(Painted). ELEVATE PANELS TO MAKE INSTALLING WALL CHANNEL ASSEMBLY EASIER WALL CHANNEL (Painted) 6 10262 Align Wall Channel to Panel Ribs and pop into place at Corner. ARROW TO TOP ELEVATED PLATFORM 1. Angle Wall Channel Channel 7 Continue aligning Channel and popping into place. 2.
Step 2: Continued You will need for this page: 10256 1 Floor Channel 8 22BY IMPORTANT 10280 2 START ASSEMBLY AT CORNER PANEL CORNER MUST BE AGAINST 45 DEGREE CUT ON CHANNEL Corner Clip Attach Floor Channel (Unpainted). ELEVATE PANELS TO MAKE INSTALLING WALL CHANNEL ASSEMBLY EASIER Channel Corner Panel CORNER CLIP 10256 FLOOR CHANNEL (UNPAINTED) ELEVATED PLATFORM 1. Angle Floor Channel Wall Panels Channel CORNER CLIP 2.
Step 3: Front Wall You will need for this page: (QTY: 1) ARROW TO TOP 11052 (QTY: 4) 1 2 Door Jamb 2 10316 23BY 10268 Corner Panel Panel Wall MUST USE FLAT SOLID SURFACE. DO NOT SNAP ON GROUND OR GRASS. Make one (1) Front Wall Section. DOOR JAMB 1 11052 DOOR JAMB 11052 10316 10316 VERIFY PANELS ARE POSITIONED IN CORRECT SEQUENCE BY PART 2 Door Jambs always on top of Wall Panel.
Step 3: Continued You will need for this page: (QTY: 4) (QTY: 2) 10262 1 10256 1 Wall Channel Floor Channel 6 10263 1 Header Trim 24BY 10264 1 Ramp Make one (1) Wall Channel Assembly (Painted). 10262 10263 Wall Channel Assembly (Painted) Header Trim Wall Channel 8 7 Attach Header Trim to Wall Channel using two (2) washers and screws. Make one (1) Floor Channel Assembly (Unpainted).
Step 3: Continued You will need for this page: 1 1 Wall Channel Assembly Floor Channel Assembly 10 10280 2 25BY IMPORTANT START ASSEMBLY AT CORNER PANEL Corner Clip Channel CORNER MUST BE AGAINST 45 DEGREE CUT ON CHANNEL Attach Wall Channel Assembly (Painted). WALL CHANNEL ASSEMBLY (Painted) CORNER CLIP 11 FLOOR CHANNEL ASSEMBLY (UNPAINTED) Attach Floor Channel Assembly (Unpainted). IMPORTANT START ASSEMBLY AT CORNER PANEL 1.
Step 3: Continued 26BY You will need for this page: (QTY: 4) (QTY: 4) 13 15 Secure Wall Channel Assembly (Painted) using two (2) washers and screws. 14 Secure Floor Channel Assembly (Unpainted) using two (2) screws. 26 Secure Header Trim to Wall Channel Assembly (Painted) using two (2) washers and screws. 16 Secure Ramp to Floor Channel Assembly (Unpainted) using two (2) screws.
Step 4: Wall Assembly You will need for this page: 1 Side Wall Assembly (QTY: 3) CORNER PANEL ON TOP OF WALL PANEL Corner Clip Corner Panel Wall Panel 27BY 1 Rear Wall Assembly IT IS HIGHLY RECOMMENDED THAT AT LEAST 2 PEOPLE ARE PART OF ASSEMBLY. 1 Attach Side Wall and Rear Wall. 2 Attach Side Wall to Rear Wall using three (3) washers and screws at corner.
Step 4: Continued 28BY You will need for this page: 1 1 Side Wall Assembly Install Corner Clip Upper Front Wall Assembly IT IS HIGHLY RECOMMENDED THAT AT LEAST 2 PEOPLE ARE PART OF ASSEMBLY. CORNER PANEL ON TOP OF WALL PANEL Corner Clip Corner Panel 3 Attach Side Wall and Front Wall.
Step 4: Continued You will need for this page: (QTY: 9) 4 Attach remaining Walls using three (3) washers and screws at each corner.
Step 5: Gable & Beam Assy You will need for this page: 10990 2 Gable Right (QTY: 8) Snap Gables onto Upper Channel 80111 2 11048 1 10278 2 Gable Left (QTY: 4) Header Angle 1 Gable Gable Brace Install (REAR) Gable Right and Gable Left using two (2) screws in each. 10990 Upper Channel 80111 Gable Upper Channel Header Angle 11048 80111 10990 2 3 Install (FRONT) Gable Right and Gable Left along with Header Angle using two (2) screws in each.
Step 5: Continued You will need for this page: (QTY: 6) (QTY: 4) 10269 1 Ridge Beam 4 10312 1 Ridge Beam Angle Assemble Ridge Beam Angle to Ridge Beam using six (6) screws. 10269 10312 5 Install Ridge Beam Assembly to Gables using (4) nuts and bolts.
32BY Step 6: Roof pre-assy You will need for this page: (QTY: 8) 10251 2 10252 6 10250 2 Roof Panel Left Roof Panel Roof Panel Right 1 ARROW TO TOP Make two (2) Roof Sections. 2 Always cover the Arrows. 10251 10252 10320 4 Roof Channel Fascia Trim MUST USE FLAT SOLID SURFACE. DO NOT SNAP ON GROUND OR GRASS Overlap Panels and Align Ends. Snap panel ribs together.
Step 7: Roof Assembly You will need for this page: 10270 (QTY: 10) 1 Ridge Cap 1 Attach Left Roof Section to building using nine (9) washers and screws. 2 Attach Ridge Cap to Right Roof Section using one (1) washer and screw.
Step 7: Continued You will need for this page: (QTY: 13) (QTY: 12) 66860 2 Peak Cap 60H 4 Corner Cap 3 Attach Right Roof Section to building using nine (9) washers and screws. 4 Place Peak Caps between Ridge Cap and Roof Sections secure using two (2) washers and screws each. 34BY 66847 4 Vent 66860 11022 66860 5 Attach Corner Caps and Vents to building using twelve (12) screws.
Step 7: Continued You will need for this page: (QTY: 8) 6 Install four (4) screws through Ridge Beam and four (4) through Ridge Beam Angle into Roof Channels.
Step 8: Door Assembly You will need for this page: 10361 (QTY: 4) 1 10369 Vertical Door Brace 1 Vertical Door Brace 1 66715 1 Door Handle 66720 1 Padlock Eyelet 66721 4 U-Nut (Door Clip) Attach U-Nuts onto Vertical Door Brace. U-NUT (2X) TYPICAL (2) PLACES U-NUT (2X) 10361 2 Attach Door Handle and Padlock Eyelet to Vertical Door Brace using two (2) screws each.
Step 8: Continue You will need for this page: 10276 (QTY: 4) 1 10309 Door Panel Door Panel 1 10308 1 Door Panel 37BY 10275 2 Horizontal Door Brace 2 Vertical Door Brace Assy ARROW TO TOP 3 Overlap Door Panels, align ends and snap Panel Ribs together. MUST USE FLAT SOLID SURFACE. DO NOT SNAP ON GROUND OR GRASS Always cover the Arrows. 10308 10276 10309 4 10275 Attach Horizontal Door Braces to Door Panels.
Step 8: Continue You will need for this page: (QTY: 3) (QTY: 8) 10288 2 Diagonal Door Brace 6 Turn Door over. 7 Attach Diagonal Door Braces to Door Panels using three (3) screws. 10288 10288 8 Install four (4) washers and screws for Horizontal Door Braces. 9 Turn Door over. 10 38 Install four (4) washers and screws for Diagonal Door Braces.
Step 8: Continue You will need for this page: (QTY: 6) (QTY: 6) 66718 2 66720 Hinge 11 Attach two (2) Hinges to Right Door Jamb using two nuts and bolts in each hinge. 12 Attach one (1) Padlock Eyelet to Left Door Jamb using two nuts and bolts. Padlock Eyelet 39 1 1 Door Assembly 13 Attach Door Assembly to Hinges using two (2) screws in each hinge. 14 Secure Ramp to Floor Channel Assembly (Unpainted) using two (2) screws.
ARROW ACCESSORIES... 49CG ANCHOR KITS FLOOR FRAME KITS Anchor Kit contains heavy-duty steel augers, 60' (18 m) of steel cable and 4 cable clamps. No digging or concrete pouring, just insert cable under roof, over roof beams, into augers and twist augers into the ground. For buildings MODELS FB47410, FB5465, FB106-A, FB109-A, FB1014-A, and FBSDS108 A simple floor frame system made of heavy-duty, hot-dipped galvanized steel. Use as base for plywood, sand or stone. Model No.
ANCHORING OPTIONS... 50CG IMPORTANT: It is important that building be anchored after construction. these are recommended ways of anchoring. Anchor into Wood or Concrete Arrow Anchoring Kit: (Model No. AK100 or 68383) For wood platform. Use Decking Screws. For concrete slab. Use Lag Screws. Recommended for use with the concrete base. Contains: Corner gussets, perimeter clips, hardware, 1/4" masonry drill bit and installation instructions. Arrow Anchoring Kit: (Model No.
ASSEMBLY NOTES 42 46A
ASSEMBLY NOTES 43 46A