Full Product Manual

25
Step 3: Front Wall
25CG
You will need for this page:
Wall Channel
2
10341
3
Floor Channel
2
10340
Channel
Splice
11019
Make one (1) Floor Channel
Assembly (Unpainted).
2
2
10341
10341
11019
10340
10340
11019
Use rubber mallet and
gently tap Channel
Splice into Channel untill
mounting holes align.
4
(QTY: 2)
(QTY: 4)
12"
30,5 cm
11019
Make one (1) Wall Channel
Assembly (Painted).
1
Header Trim
1
10291
Ramp
1
10292
Join Channels, attach Header
Trim and screw together using
two (2) washers and screws.
Wall Channel Assembly (Painted)
10292
Floor Channel Assembly (Unpainted)
Join Channels, attach Ramp
and screw together using four
(4) screws.
10291
Wall Channel
Channel Splice
Header Trim
Floor Channel
Channel Splice
Ramp
11019
Turn Channel over and
insert Channel Splice.
Use Tapered end to start.
10341
10341
10340
10340
5
6