Full Product Manual

42
Step 8: Gable & Beam Assy
42CG
You will need for this page:
Roof Beam
4
11020
(QTY: 14)
Attach Roof Beam
Assemblies together
using (10) nuts and bolts.
2
80 3/4” (205,1 cm)
Finished Length
1
2
11020
11020
11020
11020
Assemble Roof Beams
using two (2) nuts and
bolts.
1
Overlap Length
7” (17,8 cm)
Install (REAR) Gable Right
and Gable Left using three
(3) screws in each.
3
Snap Gables
onto
Upper Channel
Gable
Upper Channel
Header Trim
Header
Angle
4
10994
80115
10994
80115
11049
Gable
Upper
Channel
Install (FRONT) Gable Right
and Gable Left along with
Header Angle using three (3)
screws in each.
(QTY: 12)
Gable Right
2
10994
Gable Left
2
80115
Header Angle
1
11049