Owner's Manual & Assembly Instructions SO01et Model No. 715831015 CO1014-C1 VS1014-C1 YT1014-C1 SG1014 DK1014-B1 VY1014-A1 697.68604-A1 LX1014-C1 WV1014-C1 697.68630-A1 Missing Parts, Questions on Assembly? Call: 1-800-851-1085 or assist@arrowsheds.com Do not return to dealer, they are not equipped to handle your requests. Storage Area: 129 Sq. Ft. 12,0 m2 852 Cu. Ft. 24,1 m3 BUILDING DIMENSIONS * Size rounded off to the nearest foot *Approx.
BEFORE YOU BEGIN.... A03 Owner's Manual Before beginning construction, check local building codes regarding footings, location and other requirements. Study and understand this owner's manual. Important information and helpful tips will make your construction easier and more enjoyable. Assembly Instructions: Instructions are supplied in this manual and contain all appropriate information for your building model.
PLAN AHEAD.... A04 Watch the Weather: Be sure the day you select to install your building is dry and calm. Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Teamwork: Whenever possible, two or more people should work together to assemble your building. One person can position parts or panels while the other is able to handle the fasteners and the tools.
SAFETY FIRST.... A05 Safety precautions are important to follow throughout the construction of your building. •Care must be taken when handling various pieces of your building since some contain sharp edges. Please wear work gloves, eye protection and long sleeves when assembling or performing any maintenance on your building. •Practice caution with the tools being used in the assembly of this building. Be familiar with the operation of all power tools.
CARE & MAINTENANCE.... A06 Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immediately clean the area with a wire brush; wash it and apply touch-up paint per manufacturer's recommendation. Roof: Keep roof clear of leaves and snow with long handled, soft-bristled broom. Heavy amounts of snow on roof can damage building making it unsafe to enter.
A07 ACCESSORIES.... FLOOR FRAME KITS ROOF STRENGTHENING (heavy snow load) KITS Extra roof beams and gable braces designed for added protection against heavy snow accumulation. Increases the strength of your roof. BEFORE AFTER ANCHOR KITS Model No. AK4 Anchor Kit contains heavy-duty steel augers, 60' (18 m) of steel cable and 4 cable clamps. No digging or concrete pouring, just insert cable under roof, over roof beams, into augers and twist augers into the ground.
A08 ORDERING ACCESSORIES.... 02/13 We recommend that you purchase accessory items from your local storage building dealer whenever possible; however, because the full line of accessories is not always available from all dealers, Arrow is offering them to you on a direct basis. There are two ways to order Arrow Storage Building Accessories: Option 1 Option 2 Accessories can be purchased through Order accessories by telephone using your MasterCard or Visa credit card. arrowsheds.
Base F09 The Base For Your Building No matter which of the options below you choose for a base, an ARROW ANCHORING KIT is recommended as an effective method of properly securing your building after assembly is complete. OPTION 1: Directly on ground (earth) Assemble your building directly on level ground (grass, dirt, rock, sand, etc.). If you choose this option Arrow has a simple kit available to provide a floor inside the shed to keep stored items off the ground.
Anchoring A10 Anchoring Down The Building It is important that the entire floor frame be anchored after the building is erected. Below are recommended ways of anchoring. Anchoring into Wood/Post: Arrow Anchoring Kit: (Model No. AK4 or 60298) Use 1/4" (6 mm) Wood Screws. There are 1/4" (6 mm) dia. holes provided in the frames for proper anchoring. Recommended for use with any suggested base. Contains: 4 Anchors with Cable, Clamps and installation instruction. 1. 2.
Hardware SO11 ctr Remove from bag of screws and save for the last step 65103 #8-32 Hex Nut (240) 65900A #10Bx1/2" (13 mm) Black Screw (8) (Packed with Screws) 65923 #8-32x3/8" (10 mm) Bolt (240) 65004 #8Ax5/16" (8 mm) Screw (446) 66045 Handle (2) 66646 Washer (521) (14 sheets of 40) 65109 #8-32 Acorn Nut (4) (Packed with Screws) 67468 Peak Cap (6) (Arrow Logo) 66769 Door Slide (4) 66382 Lower Door Guide (4) 66183 Roof Trim Cap (2 right & 2 left) 6228 Track Support (2) 67545 Weather Stripping
Parts List SO12et ctr Assembly Key No.
Assembly by Key No.
Step 1 Floor Frame Assemblies SO14ctr (8) 8934 Ramp (1) 9367 Front Floor Frame (2) 8936 Rear Floor Frame (2) 10387 Side Floor Frame (4) Parts Needed For (13) The front floor frame is made up of three pieces. The side floor frames and the rear floor frame are made up of two pieces. The holes in these pieces will align when the pieces are positioned with correct amount of overlap. The illustrations below show the proper overall length for the sides, rear and front.
Step 2 SO15 ctr Parts Needed For Frame Assemblies Rear Wall Channel 118 1/8" 300,0 cm 10389 (27) 5986 Rear Wall Angle (2) 10389 Rear Wall Channel (2) 10388 Side Wall Channel (4) 10391 Side Wall Angle (4) 10389 The main frame pieces reinforce the walls. These pieces will later be installed in the center and at the top edge of the side walls and the rear wall.
Step 3 SO16ctr Parts Needed For Roof Beam Assemblies 10386 Roof Beam (8) 10386 (30) The roof beams join the two gables and support the roof panels. The main roof beam is made up of four pieces overlapped back to back at the center. The left and right roof beam assemblies are made up of two pieces. Hint: These pieces are force-fitted, so you may have to press hard to join them together.
Step 4 Parts Needed For 6403 Door Track Splice (1) 9366 Door Track (2) Door Track Assembly A17 ctr NOTE: Door Track Splice (painted part) (4) 6403 The door track assembly supports the sliding doors and reinforces the front wall. It is made up of three pieces. 1 Using the door track splice, (painted), join the door track (galvanized) pieces end-to-end as shown. 66769 9366 9366 2 STEP STEP 1 2 Insert four screws from the underside only.
Step 5 Floor Frame SO18 ctr (8) Front Floor Assembly (1) Side Floor Assembly (2) Rear Floor Assembly (1) Parts Needed For (2) RIGHT REAR 1 Assemble the four corners of the floor frame using two screws at each corner as shown. At the front corners fasten bolts through from the bottom with nuts on top. 10387 STEP 8936 1 2 Measure the floor frame diagonally. FR RIGHT FRONT ON T When the diagonal measurements are equal, the floor frame is square.
Step 6 Parts Needed For 6515 Wall Panel (2) 9373 Front Wall Panel (2) 6020 Corner Panel (4) Corners SO19 ctr Narrow Side (34) 6020 (4) Wide Side NOTE The remainder of the building assembly requires many hours and more than one person. Do not continue beyond this point if you do not have enough time to complete the assembly today. A partially assembled building can be severely damaged by light winds. REAR 6020 TOP VIEW SIDE STEP Each screw and bolt in the wall requires a washer.
Step 7 Parts Needed For Mid Frames SO20 ctr (20) Rear Wall Channel Assembly (1) Side Wall Channel Assembly (2) (4) The mid frame pieces give rigidity to the side and rear walls. 1 Fasten the rear wall channel across the middle of the rear wall using screws. 2 Fasten the side wall channels across the middle of the side panels using screws. Fasten overlaps in rear corners with bolts and nuts, at two locations. See the figure.
Step 8 Door Track Assembly (1) Rear Wall Angle Assembly (1) Side Wall Angle Assembly (2) Parts Needed For Top Frames SO21 ctr (26) The top frame pieces give rigidity to the walls and provide a surface for attaching the gables which support the roof. 1 Fasten the rear wall angle across the inside top of the rear wall using screws. 2 Fasten the side wall angles across the inside top of the side panels using screws. Side wall angles must overlap rear wall angle in corners.
Step 9 Parts Needed For Wall Panels SO22 ctr 6515 Wall Panel (10) STEP (144) 4 (15) Crimped Rib Underneath Each wall panel has a crimped rib on one side. The crimped rib should go under the rib of the panel that follows it. STEP 2 6515 1 Locate all of the wall panels and set each one alongside the building. Detail Showing Center of Panel Screwed to Wall Channel 2 Fasten the wall panels at the top and bottom with screws. 3 Fasten the center of each panel to the wall channel with screws.
Step 10 Parts Needed For 9369 Door Jamb (2) 9365 Front Wall Channel (2) Front Channel/Door Jamb SO23 ctr 9365 (4) STEP ON T The door jambs reinforce the door opening and provide an attractive trim. Follow these steps for both door jambs. 1 1 Fasten the front wall channels INSIDE OF BUILDING STEP in their positions between the end of the side wall channel and the corner panel using screws. Do not put a screw in the hole at the end behind the door opening at this time.
Step 11 Parts Needed For Gable Assemblies SO24et ctr (8) 6108 Large Right Gable (2) 6109 Large Left Gable (2) 6114 Small Right Gable (2) 6115 Small Left Gable (2) 6085 Roof Beam Bracket (4) 69835 Green Edge Trim (Plastic Piece) (16) STEP 1 The gables go on top of the front and rear walls to support the roof beams. NOTE The gables are packed nested together and might be mistaken as one piece. Carefully separate them before continuing.
Step 12 Parts Needed For Gables/Roof Beams SO25 ctr (28) Left Gable Assemblies (2) Right Gable Assemblies (2) Single Roof Beam Assemblies (2) 6636 Gable Brace (2) (12) 1 Lift and fasten a right and left gable, under angle at corner, to the door track and rear wall angle with screws. Hint: On the front gable, leave out 2 screws closest to center gable leg. On the rear gable, use a bolt and nut at the overlapping rear wall angle.
Step 13 Parts Needed For Roof Beam/Braces SO26 ctr (4) Main Roof Beam Assembly (1) 6227 Roof Beam Brace (2) (9) STEP 1 Fasten the track supports to the front gable assembly only, as shown. 1 2 Wrap the weather stripping tape Track Supports 6228 around the two joined edges of the large left and right gables. See diagram. Cut the weather stripping to length and repeat on next gable set.
Step 14 Parts Needed For (6) 6188 Right Roof Panel (1) Right Roof Panel SO27et ctr (7) Installing the roof panels is best done with a step ladder. Install the first roof panel at the back right corner of the building. Each screw and bolt in the roof requires a washer. NOTE If a Roof Beef-Up Kit was purchased, assemble prior to attaching the roof panels. STEP (6) Screws 1 STEP STEP STEP 2 3 4 Hint: Follow the fastener sequence shown for proper alignment.
Step 15 Parts Needed For Ridge Caps & Panels SO28 ctr (22) 6189 Left Roof Panel (1) 6538 Roof Panel (2) 6797 Ridge Cap (3) Screws To Roof Beam (21) 1 Install a left roof panel 6189 at the left rear corner of the roof. 2 Cut 34 short 3" (7,6 cm) strips off the small roll of weather stripping tape, and put them aside. Cover the joint at the peak with weather stripping tape, large roll. Unroll the tape and press it down over the opening at the ridge as you install each roof panel.
Step 16 Parts Needed For Ridge Caps & Panels SO29 ctr (32) 6538 Roof Panel (4) 6869 Ridge Cap (3) (16) 1 Install two roof panels 6538 work- ing side to side. Cover the notched areas of the roof panels with strips of weather stripping tape and continue weather stripping the ridge. NOTE If roof beam holes do not line up with the roof panel holes, shift the building from left to right. If this does not help, your building may not be level. Shim the corners until holes line up.
Step 17 Parts Needed For Ridge Caps & Panels SO30 ctr 6538 Roof Panel (2) 6797 Ridge Cap (3) 6188 Right Roof Panel (1) 6189 Left Roof Panel (1) (36) (72) 1 Reducing Large Gable Bulge Loosen eight bolts and nuts shown. Apply pressure with one hand at the peak of the gable and tighten bolt #1. Keeping pressure on the gable work down the slope tightening each bolt. Excess material will overlap smaller gable at seam.
Step 18 Parts Needed For Roof Trim SO31 ctr (4) 6893 Left Side Roof Trim (2) 6892 Right Side Roof Trim (2) 6015 Side Roof Trim (2) (10) 1 Attach the right, left and side roof trim to the lower end of the roof panels on each side of the building using screws at each panel overlap. NOTE A single screw fastens both trim pieces at the overlap.
Step 19 SO32 ctr (6) (12) The steps on this page tell how to assemble the right door. You will perform exactly the same procedures for the left door. Each bolt and screw in the door requires a washer. Proceed as follows: 3719 Door Handle Brace (2) 10475 Right and Left Doors (2) 10497 Horizontal Door Brace (4) 6278 Vertical Door Brace (2) Parts Needed For Door Assembly (4) 66045 10497 6278 3719 66045 3719 1 Attach the door handle brace and handle to the door with 1 bolt as shown.
Step 20 SQ33 ctr Parts Needed For Right Door Assembly (1) Left Door Assembly (1) Door Installation & Adjustment Horizontal Door Brace Gable (8) Door Track Door Slide Door 1 From inside the building, put the bottom of the right door assembly (on your left when you are inside the building) behind door jamb into the front frame track. STEP STEP 1 2 2 Position the top of the door so that the holes in the door line up with the holes in the door slides.
XA34 Anchoring and Floor Frame Anchoring Anchor your building at this time. Floor Frame If you have purchased a Floor Frame Kit you need to install it at this time.
XA35 SOME FACTS ABOUT RUST SOME FACTS ABOUT RUST Rusting is a natural oxidizing process that occurs when bare metal is exposed to moisture. Problem areas include screw holes, unfinished edges, or where scrapes and nicks occur in the protective coating through normal assembly, handling and use. Identifying these natural rusting problem areas and taking some simple rust protection precautions can help to stop rust from developing, or stop it quickly as soon as it appears. 1.
CO1014-C1 DK1014-B1 WV1014-C1 YT1014-C1 LX1014-C1 VS1014-C1 VY1014-A1 697.68604-A1 697.