Use and Care Manual

Step 16
SO29 ctr
1 Install two roof panels 6538 work-
ing side to side. Cover the notched
areas of the roof panels with strips of
weather stripping tape and continue
weather stripping the ridge.
2 Install the second ridge caps 6869
overlapping the fi rst ridge caps.
Hint: The bolts on the ridge cap need
to be left loose to move the ridge cap
to the side and overlap the ribs of the
next roof panel.
3 Install two roof panels 6538 as
before working side to side while
fastening down ridge caps.
NOTE
If roof beam holes do not line up
with the roof panel holes, shift the
building from left to right.
If this does not help, your building
may not be level. Shim the
corners until holes line up.
Parts Needed For
Ridge Caps & Panels
6538 Roof Panel (4)
6869 Ridge Cap (3)
6869
Weather Stripping Tape
6869
6869
6538
6538
6538
6538
(32)
(16)
1
STEP
3
STEP
2
STEP
29