01DOb 715800520 Owner’s Manual & Assembly Guide www.arrowsheds.com Model No. AR1012 C1 AR1012FB C1 LW1012 MRD1012 Gloves must be worn at all times to reduce risk of injury! 10’ x 12’ Nominal Size Base Size BUILDING DIMENSIONS Approx. † Size 10’ x 12’ 3,0 m x 3,7 m † Storage Area 115 Sq. Ft. 686 Cu. Ft. 2 10,7 m 19,4 m3 * See Inside for Detailed Safety Information.
SAFETY PRECAUTIONS... 02A Safety precautions MUST be followed at all times throughout the construction of your building! Care must be taken when handling various pieces of your building since many contain sharp edges. Please wear work gloves, eye protection and long sleeves when assembling or performing any maintenance on your building. Practice caution with the tools being used in the assembly of this building. Be especially familiar with the operation of all power tools.
ASSEMBLY TIPS & TOOLS 03A Watch the Weather Closely: Be sure the day you choose to install your building is dry and calm. Do NOT attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Use Teamwork: Two or more people are required to assemble your building. One person can hold the parts or panels in place while the other person fastens them together and handles the tools. This makes the process of assembling your building faster and safer.
04A FREQUENTLY ASKED QUESTIONS Q. How long will it take to assemble the building? A. Assembly time depends on a variety of factors, including roof design, tools available, DIY skill and the pace at which you work. Guidelines for each shed assembly are approximate AFTER completion of the base, and assume two or more people working on the assembly. Generally, you should plan on at least one day working with someone who can assist you; again, after constructing the base.
05A Q. What kind of base do I use? A. You can: •Use an Arrow Base Kit •Pour a concrete slab •Build a wood deck/floor (use exterior-grade plywood) •Use patio blocks •Build on crushed gravel, dirt or grass Arrow provides a base kit accessory that is an option for most building sizes. If you are building a wood deck/floor, an Arrow floor frame kit on top of your deck/floor assembles in minutes and provides a floor frame suitable for a 5/8” exterior-grade plywood floor (not included).
Q. What if the rear wall angle and channels are too large to fit inside of the rear wall panels? A. Check the dimensions of wall assemblies. They should be slightly smaller than the floor 06Aa frames. Lay the assemblies on top of the rear floor frame and pull them up to the top of the wall panels causing the corner panels to stand erect and not lean inward. Caution: Be careful to not scratch the panels on the way up. Q. The wide rib always overlaps the crimped rib. Is there ever an exception? A.
07BJa HARDWARE LIST... Hardware Views by Key No. 2 1 Key Part No. No. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 65103 65900A 65923 65004 66045 66646 65109 67468 66769 66382 66183L 66183R 67545 6228 30028 66775 Part Description Qty.
08BJa PARTS LIST... Key Part No. No.
09BJ ASSEMBLY BY KEY NO.
BJa ASSEMBLY BY KEY NO.
ASSEMBLY BY KEY NO.
CONSTRUCTING A BASE... 12AW No matter which of the options below you choose for a base, an ARROW ANCHORING KIT is recommended as an effective method of properly securing your building after assembly is complete. OPTION 1: Directly on ground (earth) Assemble your building directly on level ground (grass, dirt, rock, sand, etc.). If you choose this option Arrow has a simple kit available to provide a floor inside the shed to keep stored items off the ground.
Step 1: Floor Frames You will need for this page: (QTY: 8) Washers are to be used on painted parts only. Washers are not necessary on unpainted parts and there are not enough to use on every screw and bolt. 10392 4 Side Floor Frame 10392 BUILD TWO (2) FRAMES 1 13AW Overlap two (2) Side Floor Frames as shown and secure with four (4) bolts. Two (2) bolts must enter from bottom. Assemble a second Side Floor Frame Assembly by repeating part 1.
A Step 1: Continued You will need for this page: (QTY: 5) 8936 2 Rear Floor Frame 8936 Assemble the Rear Floor Frames. 3 Overlap two (2) Rear Floor Frames as shown and secure with five (5) bolts. Two (2) bolts must enter from bottom. 4 Check that the finished length of the Assembly is 119 3/8” (303,2 cm). Set aside for use in Step 5. 8936 Bolts thru Top. Bolts thru Bottom.
A Step 1: Continued You will need for this page: 2 9367 Front Floor Frame (QTY: 8) 8934 1 Finished Length Ramp Overlap Length 7 3/8” 18,7 cm 9367 5 119 3/8” 303,2 cm Overlap the Ramp and two (2) Front Floor Frames so that four (4) holes align at each end as shown. Insert four (4) screws in each end. 8934 Confirm that the drain holes are facing outside the building. Check that the finished length of the Assembly is 119 3/8” (303,2 cm). Set aside for use in Step 5.
AW Step 2: Wall Frames You will need for this page: (QTY: 9) 10389 2 Rear Channel 5986 2 Rear Angle 5986 5986 10389 Overlap two (2) Rear Wall Channels so that eight (8) holes align as shown. Insert a bolt and nut through each hole. Check that the finished length of the Assembly is 118 1/8” ( 300,0 cm) set aside for use in Step 10. 1 10389 Overlap two (2) Rear Wall Angles so that five (5) holes align as shown. Insert a bolt and nut through the center hole.
AZ Step 2: Continued You will need for this page: 10390 4 Side Channel (QTY: 18) 10394 4 140 3/8” 356,6 cm Finished Length Side Angle Overlap two (2) Side Wall Channels so that eight (8) holes align as shown. Insert a bolt and nut through each hole. Check that the finished length of the Assembly is 140 3/8” (356,6 cm) set aside for use in Step 10. 3 Overlap two (2) Side Wall Angles so that three (3) holes align as shown. Insert a bolt and nut through the center hole.
Step 3: Roof Beams You will need for this page: 10397 BUILD TWO (2) BEAMS Roof Beam (QTY: 16) 1 10397 4 18BJ Overlap two (2) Roof Beams so that the bottom slots align as shown. Insert six (6) bolts and nuts as shown below. Insert two (2) bolts and nuts into slots on bottom of the Beam as shown. Check that the finished length of the Assembly is 142 3/8” (361,6 cm). Set aside for use in Step 12. 2 3 Repeat parts 1 & 2 to build a second Roof Beam Assembly.
BJ Step 3: Continued You will need for this page: (QTY: 14) 10397 4 142 3/8” 361,6 cm Finished Length Roof Beam Overlap two (2) Roof Beams so that bottom slots align but DO NOT INSERT BOLTS. Next, overlap two (2) more Roof Beams to form a second Roof Beam Assembly. DO NOT INSERT BOLTS . Place both Roof Beam Assemblies back-toback to form a Double Beam. Insert ten (10) bolts and nuts as shown below. Insert four (4) bolts and nuts into slots from bottom.
A Step 4: Door Track You will need for this page: 6403 Track Splice (Painted) (QTY: 4) 1 Door Track END VIEW 4 9366 2 CORRECT Long Leg on top. Door Slide Insert screws into bottom side only. The Gables will fasten to the Door Track using the holes on the top side. 1 Align two (2) Door Tracks with the four (4) holes in the bottom of the Door Track Splice and insert four (4) screws. 2 Position the Door Slides in the Door Track. Check that the finished length is 118 1/8” (300,0 cm).
Step 5: Frame Assembly You will need for this page: (QTY: 8) (QTY: 2) 21A Assemblies from Step 1: • • • Front Floor Assembly (1) Side Floor Assembly (2) Rear Floor Assembly (1) Do NOT fasten your Floor Frames to your Base at this time. You will anchor your building after it is erected. If using a Floor Frame Kit, you must wait until after assembly to install it. 1 Assemble Floor Frame with two screws at each corner as shown.
BJ Step 6: Corners You will need for this page: (QTY: 38) 6515 2 (QTY: 4) Wall Panel 9373 2 6514 4 Corner Panel Front Panel Place washers on all bolts and screws used on painted parts. 6515 Use one person to support the Corner while another secures the Panels. Do not leave the Corner unsupported until it is secure. 1 Be cautious when maneuvering and placing Panels.
AW Step 7: Wall Framing You will need for this page: Assemblies from Step 2 and Step 4: • • • (QTY: 30) Rear Wall Angle Assembly (1) Side Wall Angle Assemblies (2) Door Track Assembly (1) Install one Side Wall Angle Assembly first. Install the Rear Wall Angle Assembly second. Install the other Side Wall Angle Assembly third. Door Slides should be in Door Track at this time. Install the Door Track Assembly last. 1 • • • • 2 Use the number of screws shown.
BJ Step 8: Wall Panels You will need for this page: FASTEN TO WALL ANGLES 6515 8 [ NO HARDWARE NEEDED FOR THIS STEP ] Wall Panel 1 Lay out all Panels in the positions shown below. FASTEN TO WALL CHANNELS (STEP 10) Use the diagram to the right when attaching Wall Panels. • Secure the top row to Wall Angles. • Secure the middle row to Wall Channels (Step 10). • Secure the lower row to Floor Frames. • Secure the circled holes to the Panel next to it.
AW Step 8: Continued You will need for this page: (QTY: 84) Use bolts to attach Wall Panels where Rear Wall Angles overlap. (QTY: 13) Working one side at a time, lift the Panels into place and secure top and bottom of Panels with screws. Be sure to overlap ribs as shown on the previous page. 2 3 Place a bolt and nut through the center hole of the Panel everywhere Panels overlap, as shown below. Attach Wall Panels with screws thru all holes in top and bottom of Panels.
Step 9: Door Jambs You will need for this page: (QTY: 8) 1 (QTY: 4) 9369 2 Door Jamb Secure Door Jambs with two (2) screws in the top and bottom of each Panel as shown. Insert two (2) bolts and nuts into the back side of each Panel as shown below. Secure the bolts with both a standard nut and an acorn nut. 2 3 Leave the holes in the center of each Door Jamb open as shown below. Acorn nut should be visible from outside building.
Step 10: Wall Channels You will need for this page: (QTY: 66) 1 2 (QTY: 4) 9365 2 Front Channel Assemblies from Step 2: • • Rear Wall Channel Assembly (1) Side Wall Channel Assemblies (2) Install Rear Wall Channel by placing screws through all remaining holes in Wall Panels. Install Side Wall Channels by placing screws through all remaining holes in Wall Panels. 3 Install Front Wall Channels by placing screws through all remaining holes in Wall Panels.
29A Step 11: Gables You will need for this page: (QTY: 8) 8577 2 Left Gable 8576 2 Right Gable 6635 4 Gable Brace GABLES ARE STACKED TOGETHER DURING SHIPPING AND MAY BE MISTAKEN FOR ONE GABLE! SEPARATE GABLES BEFORE CONTINUING. Edge Trim (Plastic) Edge Trim MUST cover Gable edge. Install Edge Trim to cover Gable Edge BEFORE doing ANY work with Gables. Failure to do so could result in injury. 1 Install Gable Braces on all Gables using two (2) bolts and nuts per Brace.
Step 11: Continued You will need for this page: (QTY: 14) (QTY: 3) 9009 1 Gable Brace Gable must fit UNDER Side Wall Angle at corner. 2 Working with one Gable at a time, attach the Rear Gables to the Rear Wall Angle with screws. 3 Insert two (2) bolts and nuts where Wall Angles overlap. 4 To secure Gables together, position the Gable Brace as shown and insert a single bolt and nut through the second hole from the bottom only. Use bolts where Angles overlap.
Step 11: Continued You will need for this page: (QTY: 18) (QTY: 2) 9009 1 Gable Brace 2 Track Sup. Working with one Gable at a time, attach the front Gables to the Door Track with screws. Do not insert screws into the two (2) holes closest to the peak of each Gable. These will be used to attach the Track Support later. 5 6 To secure Gables together, position the Gable Brace as shown and insert a single bolt and nut through the second hole from the bottom only. 7 Position Track Support as shown.
Step 12: Roof Framing You will need for this page: Assemblies from Step 3: (QTY: 12) • • Main Roof Beam Assembly (1) Single Roof Beam Assemblies (2) Tape should wrap around gap between Gables. Top View of Gables 1 Seal the gap between the Gables using the weather stripping tape as shown. Do this at both ends of the building before installing Roof Beams. Weather Stripping Tape 2 Position the Roof Beams as shown below and install using two (2) bolts and nuts per side.
Step 12: Continued You will need for this page: (QTY: 4) 33A 9204 2 Beam Brace In the front, attach the Roof Beam Brace to the Track Support with one (1) bolt and nut as shown and rotate to align with Roof Beam. Secure to Roof Beam with one (1) bolt and nut as shown. In the rear, attach the Roof Beam Brace to the Gable with one (1) bolt and nut as shown and rotate to align with Roof Beam. Secure to Roof Beam with one (1) bolt and nut as shown. 3 4 Tab end attaches to Roof Beam.
Roof Install Prep Page 33BJ Use the information on this page to complete steps 13 thru 14. If Roof Beam holes do not line up with Roof Panel holes, shift the building from left to right. If this does not help, your building may not be level. Shim the corners until holes line up. Measure the building diagonally again to make sure the building is square. The building should be square at the base and at the top. This will make roof panels fit better and holes will better align.
Step 13: Roof Assembly You will need for this page: 3 4 5 1 1 9086 67545 1 Weather Stripping Right Roof Panel Left Roof Panel (QTY: 12) (QTY: 16) 1 2 9087 34BJ Attach Back Right Roof Panel to Top Roof Beam only using four (4) screws. Remove Edge Trim from the Left Gable under the Roof Panel. Continue fastening Roof Panel to Gable and Lower Roof Beam using six (6) bolts and nuts and four (4) screws. Do not fasten to Side Wall Angle at this time. Install Back Left Roof Panel.
BJ Step 13: Continued You will need for this page: (QTY: 16) (QTY: 4) 7743 2 Roof Panel 7 Ridge Cap FASTEN TO RIDGE CAP (NEXT TWO PAGES) Continue to apply weather stripping. 6 1 6869 Attach two (2) Roof Panels using the diagram to the right while assembling the roof. Attach Long Ridge Cap with two (2) bolts and nuts. DO NOT secure end of Ridge Caps until Peak Caps are in place. FASTEN TO ROOF BEAMS WITH SCREWS Do not fasten the holes on the lower end of the Panels.
` Step 13: Continued You will need for this page: (QTY: 16) 7743 2 1 Ridge Cap Roof Panel (QTY: 4) 6868 36BJ FASTEN TO RIDGE CAP (NEXT TWO PAGES) Continue to apply weather stripping. 9 Attach two (2) Roof Panels using the diagram to the right while assembling the roof. 10 Continue installing Weather Stripping Tape to seal roof ridge. 11 Attach Short Ridge Cap with two (2) bolts and nuts as shown. DO NOT fully tighten Ridge Cap bolts until you have both Ridge Cap bolts in place.
BJ Step 13: Continued You will need for this page: (QTY: 72) 9087 1 Right Roof Panel Left Roof Panel (QTY: 20) 9086 1 7743 2 Roof Panel 6869 1 Ridge Cap Continue to apply weather stripping. 12 Attach Roof Panels, one at a time, to Roof Beams using eight (8) screws per Panel. Insert bolt and nut in middle hole where ribs overlap. 13 Attach Front Left and Right Roof Panels, one at a time, to Roof Beams using eight (8) screws per Panel.
BJ Step 14: Roof Trim You will need for this page: (QTY: 4) (QTY: 8) 6015 4 (QTY: 4) Roof Trim 6014 2 Roof Trim 2 Trim Cap (L) 2 Trim Cap (R) 2 1 Slide Peak Cap legs under Ridge Cap and secure with two (2) bolts and nuts on each end. 2 Position Roof Trim as shown below and secure with screws. Do not fasten the last screw on each Corner. 3 Position the Roof Trim Caps as shown below and secure with a screw. Peak Cap Roof Trim Caps are positioned as shown.
Step 15: Door Assembly You will need for this page: (QTY: 3) (QTY: 2) 80253 1 Door 3719 1 Handle Brace 1 Attach the Door Handle and Door Handle Brace to the Door with two (2) bolts and nuts as shown. Do not fully tighten the bolts that hold in the Door Handle until the Vertical Door Brace is in place. 1 6278 Vert. Brace 39BJa 1 Handle Secure Door Handle and Handle Brace to Door with two (2) bolts and nuts. 2 Rotate the Door Handle Brace to align it with the Vertical Door Brace as shown.
BJa Step 15: Continued You will need for this page: 10497 2 (QTY: 6) 10497 2 Horiz. Brace Door Guide Repeat these steps for the other door.
BJ Step 16: Door Install You will need for this page: Assemblies from Step 15: • • Right Door Assembly (1) Left Door Assembly (1) (QTY: 8) Door Slide 1 2 3 From inside the building, place the bottom of the Door into the Front Floor Frame track at about the halfopen position. Gable Door Track Rotate the Door forward until it is vertical and align the Door Slides with the Door. Door INSIDE BUILDING Insert two (2) Black Screws into each Door Slide as shown below. Repeat steps for second door.
ANCHORING OPTIONS... 43A IMPORTANT: • • • • If you have swing doors, they must hang and swing level before anchoring building. Anchor your building at this time. See below for details on anchoring. If you have purchased a Floor Frame Kit, you should install it at this time. Please take a moment to ensure that the building is installed in accordance with these instructions and with all applicable regulations.
CARE & MAINTENANCE... 44A Exterior Care: For a long lasting finish, clean and wax the exterior surface. We recommend washing with a mild soap solution. DO NOT use power washing to clean your shed. Using a spray automotive type wax periodically on the exterior is highly recommended if you are in a high humidity or coastal climate region. Combustibles and corrosives must be stored in air tight containers designed for chemical and/or combustible storage.
ARROW ACCESSORIES... ROOF STRENGTHENING (heavy snow load) KITS Extra roof beams and gable braces designed for added protection against heavy snow accumulation. Increases the strength of your roof. ANCHOR KITS BEFORE 45A FLOOR FRAME KITS MODELS FB47410, FB5465, FB106-A, FB109-A and FB1014-A AFTER Model No. AK4 A simple floor frame system made of heavy-duty, hot-dipped galvanized steel. Use as base for plywood, sand or stone.