Instructions / Assembly
1 Place right and left facia over
front roof channels with largest
amount of holes on top. Butt together
and fasten bottom flange with ten
#10Ax 3/8" (10 mm) screws. Fasten
top flange using six #10 screws where
shown.
2 Place right and left facia over end
roof channels. Fasten bottom flange
with five #10 screws. Fasten top
flange in the same manner.
3 Place a well-nut on top flange of
the front right and left facia. Insert all
the way into pre-drilled hole until
flange is firmly against mounting sur-
face. Continue along length of the
front right and left facia pieces.
Step 5
BL16
● Parts Needed For ●
Facia Assembly
16
● ●
● ●
● 9654 Right Facia (two)
● ●
● ●
● 9657 Left Facia (two)
Press firmly against mounting surface
#10-32 Well-Nut
9654
9657
Overlap
Facia
Post
Roof Channel
9657
STEP
2
STEP
3
STEP
1
9654