Owner's Manual & Assembly Instructions WP01 Model No. 697.68222 715500109 BUILDING DIMENSIONS *Approx. Size * Size rounded off to the nearest foot Foundation Size 10' x 12' 121" x 143 1/4" Storage Area Sq. Ft. Cu. Ft. 115 3,0m x 3,6m 307,3cm x 363,9cm 10,7m2 CAUTION: SOME PARTS HAVE SHARP EDGES. CARE MUST BE TAKEN WHEN HANDLING THE VARIOUS PIECES TO AVOID A MISHAP. FOR SAFETY SAKE, PLEASE READ SAFETY INFORMATION PROVIDED IN THIS MANUAL BEFORE BEGINNING CONSTRUCTION.
BEFORE YOU BEGIN.... A2 Owner's Manual Before beginning construction, check local building codes regarding footings, location and other requirements. Study and understand this owner's manual. Important information and helpful tips will make your construction easier and more enjoyable. Assembly Instructions: Instructions are supplied in this manual and contain all appropriate information for your building model.
PLAN AHEAD.... A3 Watch the Weather: Be sure the day you select to install your building is dry and calm. Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Teamwork: Whenever possible, two or more people should work together to assemble your building. One person can position parts or panels while the other is able to handle the fasteners and the tools.
SAFETY FIRST.... A4 Safety precautions are important to follow throughout the construction of your building. •Care must be taken when handling various pieces of your building since some contain sharp edges. Please wear work gloves, eye protection and long sleeves when assembling or performing any maintenance on your building. •Practice caution with the tools being used in the assembly of this building. Be familiar with the operation of all power tools.
CARE & MAINTENANCE.... A5 Web Finish: For long lasting finish, periodically clean and wax the exterior surface. Touchup scratches as soon as you notice them on your unit. Immediately clean the area with a wire brush; wash it and apply touch-up paint per manufacturer's recommendation. Roof: Keep roof clear of leaves and snow with long handled, soft-bristled broom. Heavy amounts of snow on roof can damage building making it unsafe to enter.
ACCESSORIES.... A6 WEB ROOF STRENGTHENING (heavy snow load) KITS FLOOR FRAME KITS Extra roof beams and gable braces designed for added protection against heavy snow accumulation. Increases the strength of your roof by 50%. ANCHOR KITS Model No. AK4 Anchor Kit contains heavy-duty steel augers, 60' (18m) of steel cable and 4 cable clamps. No digging or concrete pouring, just insert cable under roof, over roof beams, into augers and twist augers into the ground.
THIS PAGE WAS LEFT BLANK INTENTIONALLY 7
THIS PAGE WAS LEFT BLANK INTENTIONALLY 8
Foundation AQ09 The Foundation For Your Building OPTION 1: ARROW FLOOR FRAME KIT: (Order No. FB1014-A or 68387-A) Arrow has the best base for your building in this simple kit. It keeps stored items above the ground . This kit should be used with one of the following: A. To support a plywood deck B. To be filled with sand. We recommend the combined use of 1. an ARROW FLOOR FRAME KIT and 2. an ARROW ANCHORING KIT as an effective method of securing the building to the ground.
Anchoring A10 Anchoring Down The Building It is important that the entire floor frame be anchored after the building is erected. Below are recommended ways of anchoring. Arrow Anchoring Kit: (Model No. AK4 or 60298) Recommended for use with any suggested base. Contains: 4 Anchors with Cable, Clamps and installation instruction. Anchoring into Wood/Post: Use 1/4" Wood Screws. There are 1/4" (0,63cm) dia. holes provided in the frames for proper anchoring. 1. 2.
Hardware WP11 Remove from bag of screws and save for the last step 65103 #8-32 Hex Nut (236) 65900A #10Bx1/2" (13mm) Black Screw (8) (Packed with Screws) 65923 #8-32x3/8" (10mm) Bolt (236) 65004 #8Ax5/16" (8mm) Screw (416) 66045 Handle (2) 66646 Washer (491) (13 sheets of 40) 65109 #8-32 Acorn Nut (4) (Packed with Screws) 67468 Peak Cap (6) (Arrow Logo) 66769 Door Slide (4) 66382 Lower Door Guide (4) 66183 Roof Trim Cap (2 right & 2 left) 6228 Track Support (2) 67545 21' Weather Stripping (1)
Parts List WP12 12 Assembly Key No.
Assembly by Key No.
Step 1 ● 8934 Ramp (1) ● 9367 Front Floor Frame (2) ● 8936 Rear Floor Frame (2) ● 10392 Side Floor Frame (4) ● Parts Needed For ● Floor Frame Assemblies SV14 The front floor frame is made up of three pieces. The side floor frames and the rear floor frame are made up of two pieces. The holes in these pieces will align when the pieces are positioned with correct amount of overlap. The illustrations below show the proper overall length for the sides, rear and front.
Step 2 ● Parts Needed For ● Frame Assemblies SR15 The main frame pieces reinforce the walls. These pieces will later be installed in the center and at the top edge of the side walls and the rear wall.
Step 3 ● Parts Needed For ● Roof Beam Assemblies ● 10397 Roof Beam (8) SV16 The roof beams join the two gables and support the roof panels. The main roof beam is made up of four pieces overlapped back to back at the center. The left and right roof beam assemblies are made up of two pieces. Hint: These pieces are force-fitted, so you may have to press hard to join them together. 1 Place one end of a roof beam inside another roof beam so that the six holes in each piece align.
● Parts Needed For ● Step 4 Door Track Assembly ● 6403 Door Track Splice (1) ● 9366 Door Track (2) A17 NOTE: Door Track Splice (painted part) The door track assembly supports the sliding doors and reinforces the front wall. It is made up of three pieces. 6403 1 Using the door track splice, (painted), join the door track (galvanized) pieces end-to-end as shown. 2 Insert four screws from the under- 66769 9366 9366 side only.
Step 5 ● Front Floor Assembly (1) ● Side Floor Assembly (2) ● Rear Floor Assembly (1) ● Parts Needed For ● Floor Frame SW18 RIGHT REAR 10392 1 Place the floor frame pieces that STEP you assembled earlier on the foundation. Assemble the four corners of the floor frame using two screws at each corner as shown. At the front corners fasten bolts through from the bottom with nuts on top. 1 8936 FR ON T RIGHT FRONT 10392 9367 2 Measure the floor frame diagonally.
Step 6 ● Parts Needed For ● ● 6515 Wall Panel (2) ● 9373 Front Wall Panel (2) ● 6514 Corner Panel (4) Corners SR19 NOTE The remainder of the building assembly requires many hours and more than one person. Do not continue beyond this point if you do not have enough time to complete the assembly today. A partially assembled building can be severely damaged by light winds. 6514 Narrow Side Wide Side REAR 6514 Each screw and bolt in the wall requires a washer.
● Parts Needed For ● Step 7 Top Frames ● Door Track Assembly (1) ● Rear Wall Angle Assembly (1) ● Side Wall Angle Assembly (2) WP20 The top frame pieces give rigidity to the walls and provide a surface for attaching the gables which support the roof. 1 Fasten the rear wall angle across the inside top of the rear wall using screws. 2 Fasten the side wall angles across the inside top of the side panels using screws. Side wall angles must overlap rear wall angle in corners.
● Parts Needed For ● Step 8 ● Rear Wall Channel Assembly (1) ● Side Wall Channel Assembly (2) Mid Frames WP21 The mid frame pieces give rigidity to the side and rear walls. 1 Fasten the rear wall channel across the middle of the rear wall using screws. 2 Fasten the side wall channels across the middle of the side panels using screws. Fasten overlaps in rear corners with bolts and nuts, at two locations. See the figure.
Step 9 ● Parts Needed For ● Wall Panels ● 6515 Wall Panel (8) SR22 STEP Each wall panel has a crimped rib on one side. The crimped rib should go under the rib of the panel that follows it. 4 Crimped Rib Underneath STEP 2 1 Locate all of the wall panels and 6515 set each one alongside the building. 2 Fasten the wall panels at the top Detail Showing Center of Panel Screwed to Wall Channel and bottom with screws. 3 Fasten the center of each panel to the wall channel with screws.
Step 10 ● Parts Needed For ● ● 9369 Door Jamb (2) ● 9365 Front Wall Channel (2) Front Channel/Door Jamb SO23 The door jambs reinforce the door opening and provide an attractive trim. Follow these steps for both door jambs. 9365 T 1 ON STEP in their positions between the end of the side wall channel and the corner panel using screws. Do not put a screw in the hole at the end behind the door opening at this time.
Step 11 ● 6108 Large Right Gable (2) ● 6109 Large Left Gable (2) ● 6114 Small Right Gable (2) ● 6115 Small Left Gable (2) ● 6085 Roof Beam Bracket (4) ● Parts Needed For ● Gable Assemblies WP24 The gables go on top of the front and rear walls to support the roof beams. 69835 Green Edge Trim (Plastic Piece) NOTE The gables are packed nested together and might be mistaken as one piece. Carefully separate them before continuing.
● Parts Needed For ● Step 12 Gables/Roof Beams ● Left Gable Assemblies (2) ● Right Gable Assemblies (2) ● Single Roof Beam Assemblies (2) ● 6636 Gable Brace (2) WP25 1 Lift and fasten a right and left gable, under angle at corner, to the door track and rear wall angle with screws. Hint: On the front gable, leave out 2 screws closest to center gable leg. On the rear gable, use a bolt and nut at the overlapping rear wall angle. 2 Fasten the single roof beam to the outer gable leg as shown using bolts.
Step 13 ● Parts Needed For ● Roof Beam/Braces ● Main Roof Beam Assembly (1) ● 6227 Roof Beam Brace (2) WP26 1 Fasten the track supports to the front gable assembly only, as shown. STEP 1 2 Wrap the weather stripping tape around the two joined edges of the large left and right gables. See diagram. Cut the weather stripping to length and repeat on next gable set. Track Supports 6228 3 Spread the two halves of the double STEP roof beam and fasten to the gable brace of the front gable.
Step 14 ● Parts Needed For ● ● 10510 Right Roof Panel (1) Right Roof Panel WP27 Installing the roof panels is best done with a step ladder. Install the first roof panel at the back right corner of the building. Each screw and bolt in the roof requires a washer. NOTE Measure the building diagonally again and make adjustments to make sure the building is square and level. This will make the roof panels fit better, and holes will align. Don't anchor the floor frame.
Step 15 ● Parts Needed For ● ● 10511 Left Roof Panel (1) ● 6538 Roof Panel (2) ● 6869 Ridge Cap (3) Ridge Caps & Panels WP28 1 Install a left roof panel 10511 at the left rear corner of the roof. Screws To Roof Beam 2 Cut 28 short 3"(7,6cm) strips off the small roll of weather stripping tape, and put them aside. Cover the joint at the peak with weather stripping tape, large roll. Unroll the tape and press it down over the opening at the ridge as you install each roof panel.
Step 16 ● Parts Needed For ● ● 6538 Roof Panel (2) ● 6868 Ridge Cap (3) Ridge Caps & Panels WP29 1 Install the second ridge caps 6868 overlapping the first ridge caps while installing two roof panels 6538. Hint: The bolts on the ridge cap need to be left loose to move the ridge cap to the side and overlap the ribs of the next roof panel. Cover the notched areas of the roof panels with strips of weather stripping tape and continue weather stripping the ridge.
● Parts Needed For ● Step 17 Ridge Caps & Panels ● 6538 Roof Panel (2) ● 6869 Ridge Cap (3) ● 10510 Right Roof Panel (1) ● 10511 Left Roof Panel (1) WP30 Reducing Large Gable Bulge Loosen eight bolts and nuts shown. Apply pressure with one hand at the peak of the gable and tighten bolt #1. Keeping pressure on the gable work down the slope tightening each bolt. Excess material will overlap smaller gable at seam.
● Parts Needed For ● Step 18 Roof Trim ● 6014 Side Roof Trim (2) ● 6015 Side Roof Trim (4) WP31 1 Attach the side roof trim to the lower end of the roof panels on each side of the building using screws at each panel overlap. NOTE A single screw fastens both trim pieces at the overlap. 2 Using your thumb and index finger, overbend the bottom flange of the roof panel rib at the corner inward enough so the right and left roof trim caps fit onto right and left corners.
Step 19 ● 3719 Door Handle Brace (2) ● 10475 Right and Left Doors (2) ● 10497 Horizontal Door Brace (4) ● 6278 Vertical Door Brace (2) ● Parts Needed For ● Door Assembly SO32 The steps on this page tell how to assemble the right door. You will perform exactly the same procedures for the left door. Each bolt and screw in the door requires a washer. Proceed as follows: 66045 1 Attach the door handle brace and 10497 6278 66045 3719 handle to the door with 1 bolt as shown. Don't tighten the bolt yet.
Step 20 ● Parts Needed For ● ● Right Door Assembly (1) ● Left Door Assembly (1) Door Installation & Adjustment SQ33 Gable Horizontal Door Brace Door Track Door Slide 1 Door From inside the building, put the bottom of the right door assembly (on your left when you are inside the building) behind door jamb into the front frame track. STEP STEP 1 2 2 Position the top of the door so that the holes in the door line up with the holes in the door slides.
SOME FACTS ABOUT RUST SO34 SOME FACTS ABOUT RUST Rusting is a natural oxidizing process that occurs when bare metal is exposed to moisture. Problem areas include screw holes, unfinished edges, or where scrapes and nicks occur in the protective coating through normal assembly, handling and use. Identifying these natural rusting problem areas and taking some simple rust protection precautions can help to stop rust from developing, or stop it quickly as soon as it appears. 1.