Step 17
WP30
30
Parts Needed For
Ridge Caps & Panels
6538 Roof Panel (2)
6869 Ridge Cap (3)
10510 Right Roof Panel (1)
10511 Left Roof Panel (1)
1 Install the third ridge caps 6869
overlapping the second ridge caps
while installing the remaining roof
panels 6538. Hint: The bolts on the
ridge cap need to be left loose to
move the ridge cap to the side and
overlap the ribs of the next roof panel.
Cover the notched areas of the roof
panels with strips of weather strip-
ping tape and continue weather strip-
ping the ridge.
2 Install the left 10511 and right
roof panel 10510 as you unroll the
weather stripping tape, and press it
down. Fasten the lower end of the
panels to the side wall angles using
screws and washers.
3 Fasten the roof panel ribs, peak
caps and ridge caps together using
bolts and nuts.
Reducing Large Gable Bulge
Loosen eight bolts and nuts shown. Apply
pressure with one hand at the peak of the
gable and tighten bolt #1. Keeping pressure
on the gable work down the slope tightening
each bolt. Excess material will overlap small-
er gable at seam. Once material bulge is
worked out tighten four vertical bolts that
connect the large and small gables.
Peak Cap
STEP
2
6869
STEP
2
6869
10510
STEP
3
STEP
1
Cut
Weather Stripping
and Fold Under
10511
6538
6538
6869
#1
#2
#3
#4