Owner's Manual & Assembly Instructions AJ01 Model No. 54 Sq. Ft. 345 Cu. Ft. 5,0 m2 9,8 m3 BUILDING DIMENSIONS * Size rounded off to the nearest foot *Approx. Size Base Size 10' x 6' 121" x 68 3/4" 3,0m x 1,7m ED106BS WR106EU VDGY106 697.68617 A Missing Parts, Questions on Assembly? Call: 1-800-851-1085 or assist@arrowsheds.com Do not return to dealer, they are not equipped to handle your requests.
GB: Assembly manual in additional languages available online. Scan QR code below to access. FR: Manuel de montage disponible en ligne dans d’autres langues. Pour y accéder, scannez le code QR ci-dessous. SP: Manual de montaje en idiomas adicionales disponible online. Escanee el código QR a continuación para acceder. DE: Montageanleitung in zusätzlichen Sprachen online verfügbar. Scannen Sie den QR-Code unten, um darauf zuzugreifen. IT: Manuale dell’assemblea in altre lingue disponibile online.
BEFORE YOU BEGIN.... A03 Owner's Manual Before beginning construction, check local building codes regarding footings, location and other requirements. Study and understand this owner's manual. Important information and helpful tips will make your construction easier and more enjoyable. Assembly Instructions: Instructions are supplied in this manual and contain all appropriate information for your building model.
PLAN AHEAD.... A04 Watch the Weather: Be sure the day you select to install your building is dry and calm. Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Teamwork: Whenever possible, two or more people should work together to assemble your building. One person can position parts or panels while the other is able to handle the fasteners and the tools.
SAFETY FIRST.... A05 Safety precautions are important to follow throughout the construction of your building. •Care must be taken when handling various pieces of your building since some contain sharp edges. Please wear work gloves, eye protection and long sleeves when assembling or performing any maintenance on your building. •Practice caution with the tools being used in the assembly of this building. Be familiar with the operation of all power tools.
CARE & MAINTENANCE.... A06 Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immediately clean the area with a wire brush; wash it and apply touch-up paint per manufacturer's recommendation. Roof: Keep roof clear of leaves and snow with long handled, soft-bristled broom. Heavy amounts of snow on roof can damage building making it unsafe to enter.
A07 ACCESSORIES.... FLOOR FRAME KITS ROOF STRENGTHENING (heavy snow load) KITS Extra roof beams and gable braces designed for added protection against heavy snow accumulation. Increases the strength of your roof. BEFORE AFTER ANCHOR KITS Model No. AK4 Anchor Kit contains heavy-duty steel augers, 60' (18 m) of steel cable and 4 cable clamps. No digging or concrete pouring, just insert cable under roof, over roof beams, into augers and twist augers into the ground.
ORDERING ACCESSORIES.... A08 02/13 We recommend that you purchase accessory items from your local storage building dealer whenever possible; however, because the full line of accessories is not always available from all dealers, Arrow is offering them to you on a direct basis. There are two ways to order Arrow Storage Building Accessories: Option 1 Option 2 Accessories can be purchased through Order accessories by telephone using your MasterCard or Visa credit card. arrowsheds.
Base I09 The Base For Your Building No matter which of the options below you choose for a base, an ARROW ANCHORING KIT is recommended as an effective method of properly securing your building after assembly is complete. OPTION 1: Directly on ground (earth) Assemble your building directly on level ground (grass, dirt, rock, sand, etc.). If you choose this option Arrow has a simple kit available to provide a floor inside the shed to keep stored items off the ground.
Anchoring A10 Anchoring Down The Building It is important that the entire floor frame be anchored after the building is erected. Below are recommended ways of anchoring. Anchoring into Wood/Post: Arrow Anchoring Kit: (Model No. AK4 or 60298) Use 1/4" (6 mm) Wood Screws. There are 1/4" (6 mm) dia. holes provided in the frames for proper anchoring. Recommended for use with any suggested base. Contains: 4 Anchors with Cable, Clamps and installation instruction. 1. 2.
Hardware PN11 Remove from bag of screws and save for the last step 65103 #8-32 Hex Nut (89) 65900A #10Bx1/2" (13 mm) Black Screw (8) (Packed with Screws) 65923 #8-32x3/8" (10 mm) Bolt (89) 65004 #8Ax5/16" (8 mm) Screw (284) 66045 Handle (2) 66646 Washer (166) (5 sheets of 40) 5971 Roof Beam Bracket (4) 6228 Track Support (2) 66769 Door Slide (4) 66382 Lower Door Guide (4) 66183 Roof Trim Cap (2 right & 2 left) 67468 Peak Cap (2) 67293 Weather Stripping (1) 11
Parts List AJ12 Assembly Key No.
Assembly by Key No.
Step 1 8934 Ramp (1) 9367 Front Floor Frame (2) 8936 Rear Floor Frame (2) Parts Needed For Floor Frame Assemblies Q14 The front floor frame is made up of three pieces. The rear floor frame is made up of two pieces. The holes in these pieces will align when the pieces are positioned with correct amount of overlap. The illustrations below show the proper overall length for the front and rear. Proceed as follows: 9367 8934 9367 8936 1 Place the front floor frames as shown.
Step 2 X15 Parts Needed For 9338 Right Rear Wall Angle (1) 9339 Left Rear Wall Angle (1) Frame Assembly The main frame pieces reinforce the walls. This piece will later be installed at the top edge of the rear wall. Proceed as follows: 1 Overlap the right and left rear wall angle pieces as shown in the figure and fasten them together with one bolt in the center hole. 2 Set the assembly aside. You will use it later.
Step 3 Parts Needed For Roof Beam Assembly B16 8474 Roof Beam (1) 8476 Side Wall Angle (1) The roof beams join the two gables and support the roof panels. The main roof beam is made up of two pieces fastened together. 1 Place the side wall angle, backto-back, with a roof beam and fasten together using ten screws. 2 Set this piece aside for later use.
Step 4 Parts Needed For Door Track Assembly A17 6403 Door Track Splice (1) 9366 Door Track (2) NOTE: Door Track Splice (painted part) The door track assembly supports the sliding doors and reinforces the front wall. It is made up of three pieces. 1 6403 Using the door track splice, (painted), join the door track (galvanized) pieces end-to-end as shown. 2 Insert four screws from the under- side only.
Step 5 Parts Needed For Floor Frame I18 Front Floor Assembly (1) 8946 Side Floor Frame (2) Rear Floor Assembly (1) 1 Assemble the four corners of the floor frame using two screws at each corner as shown. At the front corners fasten bolts through from the bottom with nuts on top. 8946 RIGHT REAR STEP 1 8946 8936 8946 2 Measure the floor frame diagonally. When the diagonal measurements are equal, the floor frame is square.
Step 6 X19 NOTE The remainder of the building assembly requires many hours and more than one person. Do not continue beyond this point if you do not have enough time to complete the assembly today. A partially assembled building can be severely damaged by light winds. The top frame pieces give rigidity to the side walls and provide a surface for attaching the gables which support the roof. 1 Position corner posts at the corner of the floor frame as shown.
Step 7 Parts Needed For Splice Post/Door Jamb X20 5287 Splice Post (1) 7311 Door Jamb (2) STEP 1 The door jambs reinforce the door opening and provide an attractive trim. The splice post supports the rear wall. 5287 1 Position splice post at the center of the rear wall and fasten using 4 bolts and nuts into rear wall angle and 2 screws into rear floor frame. Hint: Measure or count holes to determine if post is centered on rear.
Step 8 Parts Needed For 9344 Siding Stud (6) 9365 Front Wall Channel (2) Studs/Front Channel X21 The studs provide a surface for attaching the siding panels. 1 Following dimensions, measuring from the ends of angles, place a stud between each corner and splice post at the rear of building and 2 studs between corner posts at the sides. Position stud inside top angle and fasten with a screw at the lower hole. 2 Rest bottom tab (large hole) outside floor frame. Do not fasten tab at this time.
Step 9 Parts Needed For 8719 Side Siding (6) Side Siding X22 Each screw in the wall requires a washer. CORRECT INCORRECT STEP 1 Slide side siding into channels of corner posts, flat edge upward, bottom edge down resting on floor frame. Always follow this pattern. Fasten bottom edge and tab of stud to floor frame using screws. Fasten center to stud with screws. Do not fasten flat edge yet. 3 STEP 2 STEP 8719 4 2 Install side siding as before.
Step 10 Parts Needed For 8736 Rear Siding (6) 8737 Front Siding (6) Rear/Front Siding X23 1 Slide rear siding into channel of corner and splice posts fastening to rear frame as shown in previous step 9. STEP STEP 1 2 8736 2 Install rear siding to complete each section of rear wall. Fasten top center of last siding to rear angle. Fasten Top Center of Last Siding to Stud 8736 8736 3 Slide front siding into channels of corner post and door jamb.
Step 11 � Parts Needed For � � 6000 Right Gable (2) � 6001 Left Gable (2) � 5971 Roof Beam Bracket (4) Gable Assemblies Y24et ctr (8) STEP Edge Trim (Plastic Piece) The gables go on top of the front and rear walls to support the roof beams. 1 NOTE The gables are packed nested together and might be mistaken as one piece. Carefully separate them before continuing. 1 Apply edge trim to the top edge of the right gables and left gables.
Step 12 Gables/Braces X25 ctr (20) Left Gable Assemblies (2) Right Gable Assemblies (2) 6635 Gable Brace (2) Parts Needed For (5) 1 Lift and fasten a right and left gable, under angle at corner, to the rear wall angle with screws. Hint: On the rear gable, use a bolt and nut at the overlapping rear wall angle. On the front gable, leave out 2 screws closest to center gable leg. 2 Join the left and right gables together with a gable brace using a bolt and nut in the bottom hole only.
Step 13 W26 Parts Needed For Roof Beams 1 Fasten the main roof beam to the gable brace of the front gable. Main Roof Beam (1) 8474 Roof Beam (2) STEP 3 2 Fasten the other end of the main roof beam to the gable brace of the rear gable. 8474 Roof Beam 3 STEP Fasten the remaining roof beams small holes on top as shown using bolts.
Step 14 X27et Parts Needed For STEP Installing the roof panels is best done with a step ladder. Begin installing roof panels at the back right corner of the building. Each screw and bolt in the roof requires a washer. 1 NOTE Measure the building diagonally again and make adjustments to make sure the building is square. This will make the roof panels fit better, and holes will align. NOTE If a Roof Beef-Up Kit was purchased, assemble prior to attaching the roof panels.
Step 15 X28 8468 Right Roof Panel (1) 8469 Left Roof Panel (2) 6529 Roof Panel (4) Parts Needed For Roof Assembly 8469 Left Roof Panel STEP 1 Install a left roof panel at the left rear and right front corner of the roof. Install a right roof panel at the left front corner of the roof. 1 STEP Weather Stripping Tape Roll 2 8468 Right Roof Panel 2 Cut 2 short 2" (5,1 cm) strips off the roll of weather stripping tape, and put them aside.
Step 16 W29 Parts Needed For 8461 Ridge Cap (1) 8482 Side Roof Trim (2) Ridge Cap/Roof Trim 1 Install the ridge cap on the completed roof section using bolts. Do not fasten the ends of the ridge cap until instructed to do so. STEP 8461 1 2 Fasten the lower end of the panels to the side wall angles using screws and washers. 3 Attach the side roof trim to the lower end of the roof panels on each side of the building using screws at each panel overlap.
Step 17 BB30 3719 Door Handle Brace (2) 10472 Right and Left Doors (2) 10497 Horizontal Door Brace (4) 6301 Vertical Door Brace (2) Parts Needed For Door Assembly The steps on this page tell how to assemble the right door. You will perform exactly the same procedures for the left door. Each bolt and screw in the door requires a washer. Proceed as follows: 1 Attach the door handle brace and handle to the door with 1 bolt as shown. Don't tighten the bolt yet.
Step 18 A31 Parts Needed For Right Door Assembly (1) Left Door Assembly (1) Door Installation & Adjustment Gable Horizontal Door Brace Door Track Door Slide 1 Door From inside the building, put the bottom of the right door assembly (on your left when you are inside the building) behind door jamb into the front frame track. STEP STEP 1 2 2 Position the top of the door so that the holes in the door line up with the holes in the door slides.
ED106 ED106L ED106BS SBVD106 B WR106 WR106EU VD106 A VD106EU A VDGY106 VDGY106EU 697.68617 A AJ32 Anchoring and Floor Frame Anchoring Anchor your building at this time. Floor Frame If you have purchased a Floor Frame Kit you need to install it at this time. SOME FACTS ABOUT RUST Rusting is a natural oxidizing process that occurs when bare metal is exposed to moisture.