Installation Guide
The studs provide a surface for at-
taching the siding panels.
1 Following dimensions, measuring
from the ends of angles, place a stud
between each corner and splice post
at the rear of building and 2 studs
between corner posts at the sides.
Position stud inside top angle and
fasten with a screw at the lower hole.
2 Rest bottom tab (large hole) out-
side oor frame. Do not fasten tab at
this time. Repeat procedure for the
remaining studs around the building.
3 Place front wall channel into
position behind corner post and door
jamb. Fasten using three screws.
9344 Siding Stud (6)
9365 Front Wall Channel (2)
Parts Needed For
Studs/Front Channel
Step 8
X21
9344
LARGE HOLE
DO NOT FASTEN TAB
AT THIS TIME
22 1/16"
56,0 cm
9365
29 3/16"
74,1 cm
9365
FASTEN STUD AT
LOWER HOLE
21