Specifications
(15) Torque all engine mount sill plate bolts to 61
N·m (45 ft. lbs.).
(16) Torque the left engine mount throughbolt to
61 N·m (45 ft. lbs.).
(17) Raise the vehicle on the hoist.
(18) Install the remaining lower bellhousing bolts.
Torque all the bolts to 102 N·m (75 ft. lbs.).
(19) Support the rear of the transmission with a
jack.
(20) Remove the (4) temporarily installed trans-
mission crossmember bolts.
(21) Lower the transmission and transfer case
assembly enough to gain access to the upper six bell-
housing bolts.
NOTE: Be certain all brackets that were originally
installed on the bellhousing bolts are reinstalled.
Cable misrouting could result.
(22) Install the upper six bellhousing bolts. Torque
the bolts to 102 N·m (75 ft. lbs.).
Fig. 23 Engine Mount Sill Plate Bolts - Rightside
Fig. 24 Engine Mount Sill Plate Bolts - Right Wheel
Well
Fig. 25 Engine Mount Sill Plate Bolts - Left Wheel
Well
Fig. 26 Transmission Support Crossmember
9 - 20 ENGINE WJ
REMOVAL AND INSTALLATION (Continued)










