Specifications

(7) Torque engine mount top bolt (Vertical) to 101
N·m (75 ft. lbs.)
(8) Torque engine mount thru bolt (Horizontal) to
145 N·m (107 ft. lbs.)
(9) Torque engine mount to frame bolts to 68 N·m
(50 ft. lbs.)
MOUNT—LEFT SIDE
(1) Raise vehicle on hoist and remove left front
wheel.
(2) Remove inner splash shield.
(3) Support the transmission with a transmission
jack.
(4) Remove the insulator thru bolt from the mount
(Fig. 17).
(5) Remove the transmission mount bolts and
remove mount. It may be necessary to lower trans-
mission slightly to remove mount.
(6) Reverse removal procedure for installation.
(7) Install mount. Torque transmission mount bolts
to 54 N·m (40 ft. lbs.).
(8) Align mount into frame bracket with transmis-
sion jack, install thru bolt. Torque thru bolt to 71
N·m (53 ft. lbs.).
ENGINE MOUNT—REAR
(1) Raise vehicle on hoist.
(2) Support the engine and transmission assembly
with a transmission jack so it will not rotate.
(3) Remove the thru bolt from the insulator at
crossmember connection (Fig. 18).
(4) Remove the bolts holding the mount to the
engine and transmission.
(5) Disconnect both shifter cables at transmission.
Remove the retainers holding the cables to the
mount (Fig. 19).
(6) Remove the mount assembly.
(7) Reverse removal procedure for installation.
(8) Install mount assembly. Torque bolts at engine
and transmission to 101 N·m (75 ft. lbs.).
(9) Align insulator at crossmember and install
thru bolt. Torque to 68 N·m (50 ft. lbs.).
Fig. 16 Right Engine Mount—VM Diesel
Fig. 17 Left Side Mount—VM Diesel
NS/GS ENGINE 9 - 45
REMOVAL AND INSTALLATION (Continued)