Use and Care Manual

6
Step 15: Continued
Install Track Support.
Back Gables
SB
29R
You will need for this page:
Working one (1) Gable at a time, lift Left and Right Gables into place on top of Rear Wall
Angle. Gables must go under Side Wall Angles. Secure using seven (7) Stone Screws and
one (1) Stone Bolt per Gable.
2
29
Join Left and Right Gables together using Gable Brace and securing
with one (1) Stone Bolt and Nut in the second hole from the bottom. Apply
Weather Stripping along the mating edge of the Left and Right Gable as
shown. Cut the Weather Stripping to length. Repeat for opposite side.
4
67545
Weather
Stripping
1
(QTY: 32)
SS
Gables must go under
Side Wall Angles.
Weather Stripping Tape
Top View of Gables
Tape should wrap
around gap between
Gables.
9009
Gable Brace
2
(QTY: 5)
SB
Attach Brace with Bolt thru
second hole from bottom only.
SB
6228
Track Support
2
Position Track Support as shown. Secure Track Supports to Gable using
one (1) Stone Bolt. Secure to Header using two (2) Stone Screws per side.
5
Working one Gable at a time, lift Left and Right Gables into place on top of
Header. Gables must go under Side Wall Angles. Secure using seven (7)
Stone Screws per Gable. Do not insert Screws into the two (2) holes closest
to the peak of each Gable. These will be used to attach the Track Support
later.
3
Front Gables
Leave hole open