Owner's Manual & Assembly Instructions AI01 Model No. 697.76092 A Missing Parts, Questions on Assembly? Call: 1-800-851-1085 or assist@arrowsheds.com Do not return to dealer, they are not equipped to handle your requests. 722890817 Storage Area: 84 Sq. Ft. 7,8 m2 553 Cu. Ft. 15,7 m3 BUILDING DIMENSIONS * Size rounded off to the nearest foot *Approx. Size Base Size 10' x 9' 121" x 105" 3,0 m x 2,6 m WH109 A WH109EU A 307,3 cm x 266,7 cm CAUTION: SOME PARTS HAVE SHARP EDGES.
GB: Assembly manual in additional languages available online. Scan QR code below to access. FR: Manuel de montage disponible en ligne dans d’autres langues. Pour y accéder, scannez le code QR ci-dessous. SP: Manual de montaje en idiomas adicionales disponible online. Escanee el código QR a continuación para acceder. DE: Montageanleitung in zusätzlichen Sprachen online verfügbar. Scannen Sie den QR-Code unten, um darauf zuzugreifen. IT: Manuale dell’assemblea in altre lingue disponibile online.
BEFORE YOU BEGIN.... A03 Owner's Manual Before beginning construction, check local building codes regarding footings, location and other requirements. Study and understand this owner's manual. Important information and helpful tips will make your construction easier and more enjoyable. Assembly Instructions: Instructions are supplied in this manual and contain all appropriate information for your building model.
PLAN AHEAD.... A04 Watch the Weather: Be sure the day you select to install your building is dry and calm. Do not attempt to assemble your building on a windy day. Be careful on wet or muddy ground. Teamwork: Whenever possible, two or more people should work together to assemble your building. One person can position parts or panels while the other is able to handle the fasteners and the tools.
SAFETY FIRST.... A05 Safety precautions are important to follow throughout the construction of your building. •Care must be taken when handling various pieces of your building since some contain sharp edges. Please wear work gloves, eye protection and long sleeves when assembling or performing any maintenance on your building. •Practice caution with the tools being used in the assembly of this building. Be familiar with the operation of all power tools.
CARE & MAINTENANCE.... A06 Finish: For long lasting finish, periodically clean and wax the exterior surface. Touch-up scratches as soon as you notice them on your unit. Immediately clean the area with a wire brush; wash it and apply touch-up paint per manufacturer's recommendation. Roof: Keep roof clear of leaves and snow with long handled, soft-bristled broom. Heavy amounts of snow on roof can damage building making it unsafe to enter.
A07 ACCESSORIES.... FLOOR FRAME KITS ROOF STRENGTHENING (heavy snow load) KITS Extra roof beams and gable braces designed for added protection against heavy snow accumulation. Increases the strength of your roof. BEFORE AFTER ANCHOR KITS Model No. AK4 Anchor Kit contains heavy-duty steel augers, 60' (18 m) of steel cable and 4 cable clamps. No digging or concrete pouring, just insert cable under roof, over roof beams, into augers and twist augers into the ground.
ORDERING ACCESSORIES.... A08 02/13 We recommend that you purchase accessory items from your local storage building dealer whenever possible; however, because the full line of accessories is not always available from all dealers, Arrow is offering them to you on a direct basis. There are two ways to order Arrow Storage Building Accessories: Option 1 Option 2 Accessories can be purchased through Order accessories by telephone using your MasterCard or Visa credit card. arrowsheds.
Base K09 The Base For Your Building No matter which of the options below you choose for a base, an ARROW ANCHORING KIT is recommended as an effective method of properly securing your building after assembly is complete. OPTION 1: Directly on ground (earth) Assemble your building directly on level ground (grass, dirt, rock, sand, etc.). If you choose this option Arrow has a simple kit available to provide a floor inside the shed to keep stored items off the ground.
Anchoring A10 Anchoring Down The Building It is important that the entire floor frame be anchored after the building is erected. Below are recommended ways of anchoring. Anchoring into Wood/Post: Arrow Anchoring Kit: (Model No. AK4 or 60298) Use 1/4" (6 mm) Wood Screws. There are 1/4" (6 mm) dia. holes provided in the frames for proper anchoring. Recommended for use with any suggested base. Contains: 4 Anchors with Cable, Clamps and installation instruction. 1. 2.
Hardware AI11 Remove from bag of screws and save for the last step 65103 #8-32 Hex Nut (213) 65900A #10Bx1/2" (13 mm) Black Screw (8) (Packed with Screws) 65923 #8-32x3/8" (10 mm) Bolt (213) 65004 #8Ax5/16" (8 mm) Screw (388) 66045 Handle (2) 66646 Washer (279) (8 sheets of 40) 66769 Door Slide (4) 67468 Peak Cap (6) 6228 Track Support (2) 66382 Lower Door Guide (4) 66183 Roof Trim Cap (2 right & 2 left) 11 67545 Weather Stripping (1)
Parts List AI12 Assembly Key # Part Number Part Description 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47 5986 6085 6114 6115 6227 6403 6636 10497 7858 7859 7860 7952 7953 7954 6278 8715 8716 8717 8718 8734 8740 8742 8743 10517 10517 8934 8936 8945 10475 10475 9003 9004 9005 9006 9007 5291 8737 5320 8735 5307 8736 9365 9366 9367 3719 67521 69835 Rear Wall Angle Roof Beam Bracket Small Right Gable Small Left Gable Roof B
Assembly by Key No.
Step 1 K14 Floor Frame Assemblies The front floor frame is made up of three pieces. The side floor frames and the rear floor frame are made up of two pieces. The holes in these pieces will align when the pieces are positioned with correct amount of overlap. The illustrations below show the proper overall length for the sides, rear and front. Proceed as follows: 1 Place the front floor frames as shown. Center the ramp, with drain holes facing outside, on top of the two front floor frames.
Step 2 M15 5986 Rear Wall Angle (2) 8740 Side Wall Angle (4) 9004 Right Side Wall Channel (2) 9005 Left Side Wall Channel (2) 9006 Right Rear Wall Channel (1) 9007 Left Rear Wall Channel (1) Parts Needed For Frame Assemblies The main frame pieces reinforce the walls. These pieces will later be installed in the center and at the top edge of the side walls and the rear wall.
Step 3 Parts Needed For Roof Beam Assemblies M16 The roof beams join the two gables and support the roof panels. The main roof beam is made up of four pieces overlapped back to back at the center. The left and right roof beam assemblies are made up of two pieces. Hint: These pieces are force-fitted, so you may have to press hard to join them together.
Step 4 Parts Needed For Door Track Assembly A17 6403 Door Track Splice (1) 9366 Door Track (2) NOTE: Door Track Splice (painted part) The door track assembly supports the sliding doors and reinforces the front wall. It is made up of three pieces. 1 6403 Using the door track splice, (painted), join the door track (galvanized) pieces end-to-end as shown. 2 Insert four screws from the under- side only.
Step 5 Front Floor Assembly (1) Side Floor Assembly (2) Rear Floor Assembly (1) Parts Needed For Floor Frame K18 8945 RIGHT REAR 1 Assemble the four corners of the floor frame using two screws at each corner as shown. At the front corners fasten bolts through from the bottom with nuts on top. STEP 8936 1 RIGHT FRONT FRO NT 8945 9367 2 Measure the floor frame diagonally. When the diagonal measurements are equal, the floor frame is square.
Step 6 M19 Parts Needed For Posts/Top Frames NOTE The remainder of the building assembly requires many hours and more than one person. Do not continue beyond this point if you do not have enough time to complete the assembly today. A partially assembled building can be severely damaged by light winds. The top frame pieces give rigidity to the side walls and provide a surface for attaching the gables which support the roof.
Step 7 Parts Needed For 8718 Rear Splice Post (1) 8734 Side Splice Post (2) 8717 Door Jamb (2) Splice Post/Door Jamb M20 STEP 1 The door jambs reinforce the door opening and provide an attractive trim. The splice posts support the wall. ANGLED END OF SPLICE POST MUST BE ON TOP 8734 1 8718 Position a rear splice post at the center of the rear wall and fasten using bolts and nuts into rear wall angle and screws into rear floor frame.
Step 8 Parts Needed For Mid Frames/Studs M21 Side Wall Channel Assemblies (2) Rear Wall Channel Assembly (1) 9003 Stud (6) 9365 Front Wall Channel (2) 1 Wearing gloves, bend the 2 tabs on each mid wall channel down. 2 Fasten side wall channel assemblies to the sides of building at the splice and corner posts using screws. STEP 1 3 Fasten the rear wall channel assembly across the rear of building overlapping side channels and fasten rear corners using screws.
Step 9 8735 Side Siding (5 board) (8) 5320 Side Siding (3 board) (4) 8736 Rear Siding (5 board) (4) 5307 Rear Siding (3 board) (2) 8737 Front Siding (5 board) (4) 5291 Front Siding (3 board) (2) Parts Needed For Side/Rear/Front Siding M22 Each screw in the wall requires a washer. CORRECT INCORRECT 1 Slide side siding (5 board) into channels of corner and splice posts, flat edge upward, slotted edge down resting on floor frame. Always follow this pattern.
Step 10 ZS23 7858 Large Right Gable (2) 7859 Large Left Gable (2) 6114 Small Right Gable (2) 6115 Small Left Gable (2) 6085 Roof Beam Bracket (4) 7860 Mid Gable Brace (4) Parts Needed For Gable Assemblies The gables go on top of the front and rear walls to support the roof beams. 69835 Green Edge Trim (Plastic Piece) NOTE The gables are packed nested together and might be mistaken as one piece. Carefully separate them before continuing.
Step 11 Parts Needed For Gables/Roof Beams M24 Left Gable Assemblies (2) Right Gable Assemblies (2) Single Roof Beam (4) 6636 Gable Brace (2) 1 Lift and fasten a right and left gable, under angle at corner, to the door track and rear wall angle with screws. Hint: On the front gable, leave out 2 screws closest to center gable leg. On the rear gable, use a bolt and nut at the overlapping rear wall angle.
Step 12 K25 Parts Needed For Main Roof Beam (1) 6227 Roof Beam Brace (2) Roof Beam/Braces 1 STEP Fasten the track supports to the front gable assembly only, as shown. 1 2 Wrap the weather stripping tape around the two joined edges of the large left and right gables. See diagram. Cut the weather stripping to length and repeat on next gable set. Track Supports 6228 STEP 3 Spread the two halves of the main 2 roof beam and fasten the roof beam to the gable brace of the front gable.
Step 13 AI26 Parts Needed For 7952 Right Roof Panel (1) Right Roof Panel Installing the roof panels is best done with a step ladder. Begin installing roof panels at the back right corner of the building. Each screw and bolt in the roof requires a washer. NOTE Measure the building diagonally again and make adjustments to make sure the building is square and level. This will make the roof panels fit better, and holes will align.
Step 14 M27 Parts Needed For 7953 Left Roof Panel (1) 7954 Roof Panel (4) Roof Assembly Screws To Roof Beam 1 Install a left roof panel at the left rear corner of the roof. 2 Install four roof panels in the sequence and positions shown on previous page. Follow fastener sequence and instructions in Steps 13 thru 15 while fastening roof panels.
Step 15 Parts Needed For 8742 Ridge Cap (6) 7953 Left Roof Panel (1) 7952 Right Roof Panel (1) Ridge Caps & Panels M28 1 Install three ridge caps on the completed roof section using bolts and nuts. Do not fasten the ends of ridge caps until instructed to do so. STEP 1 8742 2 Fasten the remaining left and right roof panels as you unroll the weather stripping tape, and press it down, install the second ridge caps overlapping the first ridge caps.
Step 16 Parts Needed For Roof Trim M29 8743 Side Roof Trim (4) 1 Attach the side roof trim to the lower end of the roof panels on each side of the building using screws at each panel overlap. NOTE A single screw fastens both trim pieces at the overlap. 2 Using your thumb and index finger, overbend the bottom flange of the side roof trim at the corner inward enough so the right and left roof trim caps fit onto right and left corners. 3 Fasten the roof trim caps to the side trim using a screw.
Step 17 Parts Needed For (6) (4) D30ctr (12) The steps on this page tell how to assemble the right door. You will perform exactly the same procedures for the left door. Each bolt and screw in the door requires a washer. Proceed as follows: 1 Attach the door handle brace and handle to the door with 1 bolt as shown. Don't tighten the bolt yet.
Step 18 A31ctr Parts Needed For Right Door Assembly (1) Left Door Assembly (1) Door Installation & Adjustment Gable (8) Horizontal Door Brace Door Track Door Slide 1 Door From inside the building, put the bottom of the right door assembly (on your left when you are inside the building) behind door jamb into the front frame track. 2 Position the top of the door so that the holes in the door line up with the holes in the door slides.
697.76092 A WH109 A WH109EU A AI32 Anchoring and Floor Frame Anchoring Anchor your building at this time. Floor Frame If you have purchased a Floor Frame Kit you need to install it at this time. SOME FACTS ABOUT RUST Rusting is a natural oxidizing process that occurs when bare metal is exposed to moisture. Problem areas include screw holes, unfinished edges, or where scrapes and nicks occur in the protective coating through normal assembly, handling and use.