Installation Guide

Step 7
BR20
Parts Needed For
Gables/Peak/Roof Frames
8061 Left Gable (1)
8060 Right Gable (1)
8069 Side Peak Frame (1)
8066 Roof Frame (2)
STEP
1 Lift and fasten a left gable on top
of header, with lower leg under side
eave frame at corner, using screws.
Repeat Step 1 with right gable for
the opposite side of building.
2 Fasten side peak frame to the
inside top corners of gables using two
screws, top shorter leg facing inside
building. Fasten top tab of the siding
studs to the lower hole in side peak
frame using screws.
3 Position roof frames under side
peak and eave frames. Be sure the
end of frame with the shortest space
between the 1st and 2nd hole is posi-
tioned at the lower side eave frame,
and fasten using screws.
NOTE
The gables are packed nested
together and might be mistaken
as one piece. Carefully separate
them before continuing.
STEP
1
Short space
between 1st
and 2nd hole
Position of
Side Peak Frame
8066
3
8060
8069
STEP
2
Side Peak Frame
Fasten at Lower Hole
8061
Right End
Door Location
8066
Fasten lower hole of
Side Peak Frame
Gable Fits Under
Side Eave Frame
8060
8061
20