Specifications

Installation Procedure
-
Installation Procedure
-
Clear a space in a fume hood for the Quest. The space should be about
3
ft. wide by
2
ft. deep and be at the left edge of the fume hood. Also, clear a space on the lab bench
adjacent to the fume hood for the controller.
Carefully unpack the instrument and place the Quest Reaction Unit in the hood and the
Quest Controller on the lab bench next to the hood. Remove any packaging material
from the units.
The umbilicus will be connected to the Quest Reactor Unit. Free the umbilicus from any
packing material and lay it out so the free end is placed in front of the Quest Controller
Unit.
Figure
1-1
Quest Controller Unit
QUEST
210
User Manual
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com