Specifications
Connect the Reactor Unit Manifold Tubes 
Figure  1-7  Quest Upper Reactor Assembly 
Install the three tubes on one side of the Quest Reactor Unit: 
Screw in the bushing for one end of the tube labeled "Mem. Press." to th 
le upper red 
h 
~ulk 
head fitting on the upper Reactor Assembly labeled "Manifold."  Screw the other end 
of the tube into the female threaded port on the Upper Manifold located at the top of the 
"triangle of ports (see diagram previous page)." 
Screw in the bushing for one end of the tube labeled "Man. Vent" to the red bulk head 
fitting located on the upper Reactor Assembly under the port labeled "Manifold." This 
will be the upper port of a set of 
2 
mounted together.  Screw the other end of the tube 
into the female threaded port on the Upper Manifold at in the middle of the "triangle of 
ports (see diagram previous page)." 
QUEST 
210 
User 
Manual 
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com










