Operating the Quest 
21 
0 
This chapter provides step-by-step instructions for using the Quest 2 10 Manual 
Synthesizer to complete a liquid or solid phase chemistry reaction. These instructions 
include 
1. 
Preparing the Quest for a Synthesis 
2. 
Installing the Reaction Vessels on the Quest 210 
3. 
Running Reactions on the Quest 210 
Preparing the Quest for a Synthesis 
1. 
The Quest Reactor Unit should be placed in a fume hood. 
2. 
The Controller Unit should be placed outside of the fume hood and away from 
chemical hazards. 
3. 
Verify that there is sufficient system gas at the supply. 
4. 
Install a solvent bottle (if necessary) and a filter. 
5. 
Install the rectangular glass waste tank underneath the Quest Reactor Unit. 