Specifications
Parallel Solvent Addition and Vessel Draining
6.
Wait
5
seconds, then set the Manifold Control Valves to the following
configuration. This will use the Metered Gas pressure to blow gas back through the
Solvent Bottle liquid line.
Turn
up the flow rate on the Metered Gas line by turning
the needle valve counter clockwise. Leave the valves in that configuration for 1
minute to completely empty the line.
drain
solvent
0
closed
utility
1
metered gas
vent
0
closed
utility
2
7.
Turn both Manifold Control Valves to "Closed."
8.
Unscrew the cap from the
4
L
bottle, change the white polypropylene end line filter
and install anew 4
L
bottle.
WARNING
Always place the solvent bottle in the plastic safety carrier.
QUEST
210
User
Manual
Artisan Technology Group - Quality Instrumentation ... Guaranteed | (888) 88-SOURCE | www.artisantg.com










